³Ô¹Ïtv / ENGINEERING EXPLANATIONCSP assembly readiness brief: inputs and limits01Exact suffix and handlingguidanceSelf-reported status; a record or rationaleis required outside this worksheet.02Package-specific land patternSelf-reported status; a record or rationaleis required outside this worksheet.03Paste/stencil verificationSelf-reported status; a record or rationaleis required outside this worksheet.04Measured thermal-processevidenceSelf-reported status; a record or rationaleis required outside this worksheet.Use the exact drawing and a declared revision. Examples are not approved process limits.Illustrative geometry only. Not to scale, a production setting or evidence of qualification.