PCB & PCBA ORDER ACCEPTANCE CHECKLIST ³Ô¹Ïtv engineering preparation worksheet /resources/manufacturing-quality/ Version 2026.09.16-linked-resources-r1 Project / customer: ____________________ PCB / assembly part number: ____________________ Document revision: ____________________ Prepared by / date: ____________________ Quantity / intended application: ____________________ Use this as an editable preparation checklist. It is not a manufacturing release, supplier certificate, inspection report or quote. REVIEW ITEMS 1. Product and document revisions Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 2. Applicable standards, editions, class and exceptions Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 3. Critical dimensions and electrical requirements Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 4. Inspection method and sampling for each characteristic Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 5. Functional test procedure, firmware and limits Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 6. First-article approval hold and responsible approver Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 7. Traceability fields and record retention Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ 8. Rework, concession and shipment release rules Requirement / reference: ____________________ Owner / due date: ____________________ Evidence / decision / open question: ____________________ APPROVAL AND HANDOFF Open items and permitted exceptions: ____________________ Agreed next action and responsible owner: ____________________ Released file manifest / approval reference: ____________________ Send only the appropriate project information through the Contact page. This worksheet does not upload files or transfer parameters automatically.