³ԹÏtv

³ԹÏtv · Flexible circuit engineering & manufacture

2 Layer Flex PCB Stackup & Connector Design

Check the whole contact-thickness interval, not just its nominal value.

Build a regional two-layer flex stackup and compare the contact tail against the exact connector drawing.

Two regions, two thickness definitions · schematic
Bending zoneCoverlay + adhesiveCopper / PI / copperAdhesive + coverlay
Contact zoneExposed contact + finishRegional flex constructionLocal bond + stiffener

Illustrative two-layer regions, not to scale. Define the actual layers and contact side from the drawing.

Choose what you need to resolve

Use a check below, or send existing files directly. You do not need to finish the worksheet to enquire.

Have files ready? Request a project review →

Check your connector-tail thickness

Use only the checks your project needs. Already have files? Send your files directly for a quote.

Add project details to your brief
Project details for your brief

Thickness, regional stackup & connector fit

Enter the actual constituent list for one region, top to bottom. For a contact tail, remove coverlay where it is absent and include its local finish and support. Compare different regions separately. Empty allowances are unknown, not zero.

On a fixed-layer page the selected region must contain that copper count. If the region changes layer count, use the detailed stackup page or document a separate architecture. Nominal values and allowances are proposed constituent data, not finished production limits.

Edit the physical layers (0 rows)
Physical layer order · thickness and ± allowance in µm
Layer / materialCategoryNominal µm± µmOrder
Connector drawing and accepted thickness

Include all local support and bond layers in the list above. This compares thickness only, not electrical contact, insertion force or retention. Use the exact connector document.

Compare equivalent regions and requirements. Saved A/B snapshots remain fixed until replaced. Geometry does not approve impedance, manufacture or fatigue life.

Assembly support, supply & delivery
Compare a fabrication quote · enter your rates

Use rates from a quotation or your own explicitly stated assumptions. No calibrated ³ԹÏtv tariff is included. Material, finish, tooling, test and assembly scope must match the rates.

This is an uncalibrated planning scenario, not a current market price or firm quotation. Complex constructions require engineering review. Freight, tax and anything absent from your rate scope are excluded.

No data is sent by this worksheet.

Project inputs stay in this tab. Carrying a brief uses temporary tab storage for up to 30 minutes; files are not transferred. Examples explain arithmetic and are not approved production stackups.

Use the exact connector part drawing

Identify accepted thickness, contact side, pad geometry and insertion orientation. Sum the actual contact-region construction, including finish and support where present. If coverlay is removed at the contacts, the covered bending region is not a substitute for that local calculation.

A thickness interval wholly inside the entered window is a geometric comparison, not electrical or mechanical qualification. A zero margin leaves no reserve. Unknown allowances cannot be silently treated as zero.

When ready for a fabrication enquiry, carry the approved contact construction to double-sided flexible PCB manufacturing.

Two regions: one circuit, different thicknesses

The covered-region example in the tool contains two 18 µm copper layers, a 25 µm PI core, two 12.5 µm cover films and two 15 µm cover adhesives. The arithmetic sum is 116 µm (0.116 mm). These are illustrative inputs, not a production stackup.

At an exposed contact, the top cover film and adhesive may be absent. The separate contact example includes local reinforcement and a finish allowance, giving 289 µm nominal and 268.8–309.2 µm by additive allowances. Against the hypothetical 270–330 µm connector window, the low end is 1.2 µm short. A nominal value inside the window is not enough.

Load either example above, replace its construction and limits with your actual drawing, then inspect both margins. For the manufacturing scope, continue to double-sided flex fabrication.

Read both connector margins

Lower margin = minimum proposed local thickness − connector minimum. Upper margin = connector maximum − maximum proposed local thickness. A negative value identifies the side outside the window; zero leaves no reserve. Arithmetic allowances do not establish finished thickness after pressing.

Do not copy a covered bending-section thickness into the exposed contact calculation. Keep the contact side, finish, pad geometry and reinforcement in the actual regional list. Use the exact connector part drawing and agree the measurement method.

Resolve the mismatch in the correct region

If the contact is too thin, review the specified local reinforcement, bondline and their tolerances. Changing the entire flex laminate can also affect bend geometry and electrical spacing. Compare proposed changes before altering the released stackup.

For more than one regional construction, use the regional stackup guide. Keep the contact calculation separate from any bending-zone radius comparison.

Questions to resolve before ordering

Why can nominal thickness fit while the design still needs review?

A lower or upper bound can fall outside the connector window even when the nominal value is inside. Compare both margins using actual construction allowances and the exact connector drawing.

Should I thicken the whole flex to fix the connector tail?

Review local contact reinforcement and bondline first. A global change also affects other regions, electrical spacing and bending geometry. Confirm finished local thickness and fit separately.

Product details for your design review

Existing ³ԹÏtv gallery images illustrate circuit form. Ask for construction-specific records to establish layer count, material, tolerances and test results.

From a preliminary question to a build-ready enquiry

Your project stageSend what you already haveDefine before release
Concept / budgetApplication, sketch or approximate outline, installation/motion conditions and quantity range. Unknowns are welcome.Candidate construction, unresolved dimensions, cost assumptions and whether assembly is included.
Design readyArtwork, drill data, drawing/revision and requested quantity. Identify critical contacts, bend zones and inspection requirements.Approved stackup, controlled revision, finish, tooling and inspection scope; confirm the lead-time starting conditions.
Assembly / transferBOM, placement and assembly information where available; supply responsibility, existing test baseline and known issues.Permanent supports versus temporary carriers, first-article acceptance, test ownership, delivered shape and packaging.

Compare the full quotation scope

Separate recurring manufacture from one-time tooling, carriers and test development. Compare the same material definition, finish, delivered state and acceptance evidence. A low unit price can exclude a carrier or inspection record required by your product. Request lead time against the actual materials, released files and agreed work; a target date is not a delivery guarantee.

Make sample approval useful for the next batch

Identify the drawing revision and acceptance criteria used for the first build. Record approved material substitutions and resolved engineering questions rather than relying on an email label such as “same as last time.” Ask which dimensional, electrical and construction records are included, which require separate development, and how changes will be approved before a repeat order.

Send your existing files directly, or generate a brief above and choose Carry Brief to Enquiry. Review the message and attach the actual files on Contact before submitting.

Continue with the question still open