Define a local recess by its floor, exposed layers and remaining structure. Review worst-case depth and a scoped machining budget before requesting a build.

Original engineering guidance 繚 References checked September 28, 2026

A cavity retains a defined floor
Simplified recess and protected copper surface. Intentional layer exposure requires a separate process review.

What is a cavity PCB?

A cavity PCB has a local recess that removes or omits part of the board thickness while retaining a defined structure beneath it. The recess may provide component clearance, a lower mounting plane, a thermal interface or access to a specified conductor. Its defining characteristic is the controlled remaining structure. A through cutout has no floor, and a generic board-outline shape does not communicate a cavity's depth or layer exposure.

Begin with the function of the recessed region. A pocket that only creates mechanical space has different acceptance needs from a pocket that must expose a clean copper pad for attachment. A component embedded during lamination is another construction again. These routes can share a drawing appearance but differ in materials, sequence, inspection and cost. Tell the supplier what must remain, what must be removed and what surface the next operation needs.

The most useful early enquiry includes a cross-section, the layer stack, the component or interface drawing and the dimensions measured from a named entry face. With those records, a manufacturing review can address the actual risk. A depth number by itself is insufficient because the board's layer elevations and thickness variation determine what the operation might reach.

Circuit board with a visible recessed rectangular region
Original 勛圖tv cavity product reference. Pocket depth, exposed-layer identity and acceptance results are not independently established by this photograph.

Define the floor and the copper separately

For a cavity measured from one entry face, a simple remaining-floor check is minimum board thickness minus maximum cavity depth. If the board is 2.00 簣 0.10 mm and the cavity is 0.80 簣 0.10 mm deep, the worst-case arithmetic floor is 1.00 mm. That result describes a thickness interval only. It neither proves that the floor is strong enough nor identifies the exact layer present at its surface.

The copper check needs another coordinate. Suppose the nearest protected copper surface below the cavity is 1.30 簣 0.05 mm from the same entry face. The shallowest permitted copper position is 1.25 mm and the deepest permitted cavity is 0.90 mm, leaving 0.35 mm of modeled separation. Against a project-defined 0.20 mm requirement, the dimensional margin is 0.15 mm. These are illustrative numbers, not 勛圖tv capability limits.

Floor and protected copper are separate intervals
Illustrative dimensional or document example. Inputs and criteria must be replaced by the approved project records.
DefinitionRequired recordWhat it does not establish
Cavity openingFinished contour, location and corner geometryTool access or process capability
DepthEntry datum, nominal value and toleranceClean exposure of a particular layer
Remaining floorLocal minimum and where it is measuredMechanical strength or load rating
Protected copperNearest relevant surface and coordinate intervalElectrical isolation qualification
Exposed copperLayer identity, finish and permitted residual materialBonding or soldering suitability without review
InspectionMeasurement locations and acceptance methodAcceptance of unmeasured regions

Coordinate definitions must remain consistent. A layer centerline is not its nearest copper surface. A board thickness including solder mask should not be mixed with a cavity depth measured from bare laminate without adjustment. If the tolerance data use different reference conventions, align them before calculating. Apparent numerical precision does not repair an inconsistent dimensional basis.

Review floor thickness and protected-copper separation

Enter the board, cavity and protected-copper intervals from the same face. The worksheet computes the lower floor thickness and minimum separation to the specified copper surface, then compares each with a requirement you supply. The copper coordinate represents a protected conductor beneath the floor, not every layer removed above it. The full layer stack must still be reviewed outside this simplified model.

勛圖tv ENGINEERING

Cavity floor and protected-copper interval review

Mechanical Features
Loading Cavity floor and protected-copper interval review…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Selecting intentional copper exposure does not produce an automatic approval. The tool continues to show the dimensional accounting but directs that condition to layer-specific manufacturing review. A cutter reaching a copper coordinate does not guarantee a clean, undamaged and suitably finished pad. Tool runout, resin residue, stop strategy, registration and copper thickness all matter to the actual exposed surface.

Keep the downloaded brief with the drawing revision and the source of each allowance. The tool retains negative margins so a risk is visible. It does not substitute a convenient zero or silently change a cavity into a through opening. If required dimensions are unresolved, use the enquiry route directly; there is no need to invent inputs before discussing the construction.

Choose the manufacturing route from the required result

One possible route is controlled-depth removal from an otherwise established board construction. Another uses prepared openings in selected material layers during the build. A component-embedding process may involve additional lamination, filling and electrical interconnection decisions. The appropriate route depends on what is inside the recess, what must survive around it and how the final surface will be used. The quotation should identify the selected construction rather than rely on the single word cavity.

The distinguishes constructions involving cavities within the layer stack. That CAD representation is useful for communicating intent, but it is not a manufacturing recipe. A separate explains its modeling context. Check that the released fabrication package contains the relevant depth and layer information, not just a convincing 3D image.

A through opening, by contrast, belongs to the PCB slot and cutout guide. A conical screw seat belongs to countersink design. Keeping these feature types distinct avoids quoting a simple routed opening when the product needs a controlled floor, or adding complex depth control when a through cutout would serve the mechanical task.

Physical circuit-board panel with copper features and exposed pads
General finished-board context from 勛圖tv media. Hidden layer structure, hole-wall quality and mechanical tolerances require traceable inspection records.

Review access, radius and the remaining structure

Every pocket needs a reachable contour. Internal corner shape, pocket width, neighboring components and fixture access influence which process can produce it. Do not draw sharp inside corners and assume a rotary operation will reproduce them. If a component requires corner clearance, show its maximum envelope and let the mechanical design accommodate the agreed corner geometry. An intentional relief must also preserve nearby copper and the required floor.

Check the residual board in more than one direction. A local recess may leave a thin floor, a narrow side wall or a weak bridge toward the board edge. These regions can respond differently during panel handling, depanelization, assembly heating and product use. The floor worksheet addresses only one-dimensional depth arithmetic. Bending, fastening and vibration require the appropriate mechanical analysis and evidence for the actual construction.

At the cavity boundary, inspect traces, planes, vias and reference continuity. A removed layer can change the electrical environment of a nearby signal or interrupt an intended return path. A thermal interface may need an exposed conductor while neighboring circuitry must remain insulated. Neither objective is guaranteed by depth control alone. Include the electrical owner in the review when the recess approaches functional copper.

Define what inspection must demonstrate

The acceptance plan should follow the cavity's function. Mechanical clearance may require contour, depth and location measurements. An exposed attachment surface may additionally need defined cleanliness, finish and damage limits. Electrical isolation requires its own design basis and verification. These requirements should be stated before fabrication so the process and inspection can be planned together.

Turn the feature into a reviewable fabrication record
Original review sequence, not an automatic approval or a certified manufacturing procedure.

Distinguish an accessible surface measurement from evidence about hidden interfaces. If a microsection, witness coupon or other destructive check is required, agree where it represents the product and what it must show. Do not assume a general board test proves pocket-floor thickness or copper exposure. Conversely, a clean cavity photograph does not establish electrical continuity elsewhere on the board.

Applicable standards belong in the contractual specification with the intended revision and class. separates design, rigid-board performance and visual acceptability roles. It should not be interpreted as a universal cavity-depth tolerance. Project-specific dimensions, inspection locations and deviations still need an agreed written basis.

Estimate the defined cavity scope

The main cost drivers include cavity count and area, depth levels, access, tolerances, copper exposure, processing sequence and inspection. An uncomplicated clearance pocket and a precision exposed pad may have similar dimensions but very different requirements. Compare the same drawing and acceptance scope across quotations. Separate setup from recurring work and identify which checks are already included in the board price.

勛圖tv ENGINEERING

Cavity PCB scoped quotation worksheet

Mechanical Features
Loading Cavity PCB scoped quotation worksheet…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

The quotation worksheet deliberately uses your actual rates or internal allowances. For an illustrative order of 100 boards with two identical cavities each at an entered allowance of 0.50 per cavity, feature work is 100. Adding 60 setup and 40 lot inspection gives 200 for that incremental scope. It excludes the base board unless you explicitly select the full-board mode and supply a separate board allowance. These values are arithmetic examples, not published prices.

No cavity volume is converted automatically into machine time, and no unverified yield penalty is added. Several depth levels, special surface treatment or unusual layer exposure may require a different quote structure. Use the tool to organize a comparison, then request a construction-specific quotation. Freight, tax and other commercial items remain outside the subtotal unless their inclusion is documented in the inputs.

Prepare a cavity enquiry that can be reviewed

Provide the board fabrication data, mechanical drawing, stackup and cavity sections through Contact. Identify the entry face, each recess boundary and level, the protected and exposed layers, quantity and any mating component. Mark unresolved items explicitly. A question about how to obtain the required surface is more useful than a guessed tolerance copied from an unrelated design.

For a surrounding layout review, use PCB DFM; for general service scope, the PCB Manufacturing page provides the commercial route. The cavity drawing should remain the authority for its local geometry. Record all agreed changes in the source design and release package before production or a repeat order.

Cavity PCB questions

Is a cavity the same as a board cutout?

A cavity retains a specified floor or local structure. A through cutout removes the full thickness. State the difference in both the drawing and the exported feature representation so the receiving engineer cannot confuse them.

Can a depth calculator approve exposed copper?

No. It can compare coordinates and tolerances, but it cannot establish a clean stop, copper integrity, surface finish or attachment quality. Intentional exposure requires a defined construction and an agreed process and inspection plan.

Does a thicker remaining floor always solve the problem?

It may improve one dimensional margin while preventing the component or interface from fitting. Electrical, thermal, mechanical and assembly requirements must be reconciled together. The useful question is which construction meets the complete product requirement.

What should I send if I do not know the cavity tolerance?

Send the mating-part envelope, required clearance, stackup and function of the floor. Identify the missing tolerance as an engineering question. The manufacturing discussion can then address a meaningful fit requirement instead of an unsupported number.

Review the mechanical feature with 勛圖tv

Send the board revision, construction, quantity and the mechanical feature or tolerance question you need reviewed. Identify unresolved requirements so the response can address them.

Send requirements for review

Optional: attach the downloaded worksheet manually. This guidance does not certify a design, approve a shipment or replace the applicable authorized standards.