Flyback power module design starts with a stored-energy cycle, then adds the transformer, switching devices, regulation and insulation system needed by the application. A small output-power number does not make those details optional. The most useful early calculation identifies an operating point and exposes what remains unknown.
This guide retains the site's established URL but does not recommend rebuilding an unidentified ATX supply. An existing transformer, controller or enclosure is usable only with adequate specifications and a suitable design review. The worksheet below is a low-level engineering calculation for an ideal discontinuous-conduction assumption, not a released circuit or instructions for modifying energized equipment.

Write the module requirement before choosing magnetics
Specify the input range at the module terminals, output voltage and power, load transients, startup behavior and environmental conditions. If there are multiple outputs, identify their regulation priorities and cross-load cases. A lightly loaded auxiliary winding can behave differently from the output used for feedback. A nominal wattage alone does not describe these operating conditions.
State whether isolation is required and the applicable insulation requirement. That decision affects transformer construction, feedback, PCB separation and the finished assembly. Transformer turns ratio is an electrical design parameter; it does not describe an insulation system. Likewise, a slot drawn on the PCB is not independent evidence that the required clearance or creepage has been achieved.
Choose the controller and operating method using their documented limits. Minimum and maximum on-time, startup supply behavior, current sensing, valley switching and light-load modes can affect the design. The ideal fixed-frequency worksheet cannot reproduce every controller mode. Retain the actual component documentation beside the working assumptions rather than applying an equation outside its intended range.
Follow the three intervals of an ideal DCM cycle
During the primary switch on-time, magnetizing current rises and energy accumulates. In the usual flyback polarity arrangement, the output rectifier does not conduct during this interval. When the switch turns off, the secondary conducts and transfers stored energy to the output. In discontinuous operation, that secondary current reaches zero before the next primary on interval.
The remaining interval is essential to the DCM assumption. A calculation that finds an on-time below the whole switching period has not yet established enough time for demagnetization. Turns ratio, output voltage, diode behavior and the chosen operating point determine the discharge interval. A design can cross into another conduction mode when input or load changes.
TI's DCM flyback design article provides a primary reference for the energy and waveform relationships. The diagram on this page is an original conceptual timeline. It omits leakage spikes, ringing and detailed parasitic behavior so the interval boundaries remain clear; those omitted effects must be considered in a practical design and in measured switch stress.
| Review item | What to establish |
|---|---|
| Envelope | Terminal input range, outputs, load corners and startup requirements. |
| Cycle | Energy, primary peak current, on-time and separate demagnetization check. |
| Magnetics | Winding/polarity, inductance conditions, core and insulation specification. |
| Layout | Primary, clamp and secondary current loops with defined sensing returns. |
| Release | Matched transformer, PCB, BOM, mechanical and test documents. |
Use the energy worksheet as a first constraint
With output power Pout, assumed efficiency 庢 and fixed switching frequency f, the simplified input energy per cycle is Pout/(庢f). If primary current starts at zero, stored energy is one half Lp times Ipk squared. The worksheet combines these relationships to estimate peak primary current, then uses Lp Ipk/Vin for ideal on-time.
For an illustrative 10 W output, 80% assumed efficiency, 100 繕H primary inductance, 100 kHz and 24 V input, energy is 125 繕J per cycle and peak primary current is about 1.581 A. Ideal on-time is about 6.59 繕s, or 65.9% of the period. This does not establish a workable flyback: the remaining time must still accommodate demagnetization and the controller's requirements.
Efficiency is an entered assumption rather than a prediction. The tool flags impossible timing such as an on-time that consumes the whole period. It cannot select a turns ratio, core, gap, winding, clamp or insulation construction. A numerically possible result is a starting constraint, not approval to order a transformer or operate a prototype.

Ideal DCM flyback energy budget
Ideal DCM flyback energy budget
Use the current inputs and keep the assumptions
Load the example to inspect its units, then clear it before entering your own revision. Example values are deliberately labeled assumptions. Complete every field; an empty numeric input is not zero. Record the operating condition behind a value rather than copying the first number found on a component summary. For a comparison, keep the measurement boundary and units consistent.
Calculate after checking the inputs. Any edit invalidates the old result and disables its report download until you calculate again. An edited example remains identified as an example. Results and reports are generated locally without uploading a circuit or populating Contact. Attach the downloaded text manually if it helps explain the question. You can request a review directly without completing the tool.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Required output power 繚 W | Steady output power at one operating point. |
| Assumed efficiency 繚 % | Project assumption or measured value; not a promised efficiency. |
| Primary inductance 繚 繕H | Linear, unsaturated inductance for this energy model. |
| Switching frequency 繚 kHz | Fixed cycles per second. |
| Input during on-time 繚 V | Low-voltage illustrative case; not a mains construction recommendation. |
Release a transformer specification with measurable properties
Provide the winding arrangement, polarity, turns information, required inductance and the conditions of its measurement. Include allowed tolerances and any leakage-inductance or capacitance requirements that matter to the circuit. A part number copied from a different supply may conceal a winding arrangement or core condition that is incompatible with the intended controller.
Core flux, saturation margin and winding temperature need their own evaluation across operating corners. The inductance used in an energy equation must be appropriate to the current and temperature being considered. Winding resistance and AC effects influence loss. The physical transformer specification must also preserve the required insulation construction and termination spacing.
State how incoming magnetics are identified and tested. A continuity check confirms connections but does not establish turns ratio, inductance or insulation performance. Where an electrical or insulation test is specified, define its method and acceptance criteria through the applicable qualified design process. Do not invent a universal test voltage from the module's output rating.
Control the switching and secondary loops on the PCB
Trace the primary input-capacitor, winding and switch loop, including the return through current sensing where used. The clamp or snubber circuit has its own placement and current path. Keep the sense connection referenced to the intended nodes so shared high-current impedance does not become an unintended measurement signal.
On the secondary, review the winding, rectifier and output-capacitor loop. Fast current changes and diode behavior can create local disturbances even when the output DC voltage appears correct. Feedback routing should observe the intended regulation point. Preserve the insulation boundary in every copper layer and in mechanical features, not only in the visible top-layer drawing.
A later point-of-load stage may use a buck converter, but its hot-loop and feedback requirements remain separate. If the module supplies an EVSE controller, identify the interface and startup requirements of that board. System integration should show what happens when one rail is present and another is absent, rather than assuming simultaneous startup.
Validate the operating envelope and manufacturing handoff
Measure startup, no-load or light-load operation, full-load conditions and the defined input corners with a documented setup. Record switch stress and output behavior using suitable instrumentation and probe references. Include thermal stabilization and the final enclosure or cooling condition where these affect the result. One open-bench nominal waveform cannot establish the complete module envelope.
Keep loop behavior, fault response and insulation qualification distinct from assembly workmanship inspection. The production test should verify the agreed repeatable properties without being described as a replacement for design validation. Preserve firmware or controller configuration where relevant and identify critical component substitutions before purchase.
For a manufacturing proposal, send the controlled board files, transformer specification, BOM, mechanical interfaces, quantity and acceptance scope. Label unresolved design assumptions explicitly, including any proposed reuse of an existing component. The resulting quotation can then cover a defined module rather than an ambiguous power-supply concept. The calculator report can accompany the inquiry manually, but no tool result certifies the circuit or transfers files automatically.
Turn arithmetic into a controlled operating-point review
A converter has several different limits: voltage stress, current stress, magnetic behavior, heat, regulation and insulation where applicable. A favorable result in one calculation does not settle the others. Keep the input/load condition beside each result and identify the component evidence or test required to close the remaining questions.
Review the physical current path and measurement reference together. Layout parasitics can change switching stress even when nominal schematic values remain the same. A component substitution can alter inductance under bias, capacitor behavior, gate charge or loop response. Carry those dependencies into the BOM approval process and the test plan. A quotation should state what fabrication, assembly and verification are included, with unresolved design decisions kept visible instead of hidden inside a generic power rating.
Standards, source context and limits
Use the exact device revision and application conditions when applying manufacturer guidance. Reference designs are evidence about a specified implementation, not automatic validation of a modified board. Workmanship inspection, functional verification, product safety and application performance are different acceptance tasks. Public summaries do not replace the applicable licensed standards or a project-specific acceptance specification.