Battery Internal Resistance Measurement: DC Pulses and AC Tests
Battery internal resistance measurement describes a response under a specified test method. A DC pulse result and an AC impedance result can differ without either instrument being wrong. The useful comparison records current or frequency, timing, state of charge, temperature and the terminal connection rather than reducing the battery to one context-free number.
This guide focuses on measurement interpretation and the electronics interface. It does not assign universal good/bad resistance limits or infer remaining capacity. For how measurements affect a display, use the battery charge indicator page; for the protection circuit's current path, see battery protection diagrams.

Choose the method that answers the engineering question
A DC current step observes how terminal voltage changes when the load changes. The apparent resistance depends on when the voltage is sampled because the battery response includes more than an ideal resistor. A very early observation and a later observation can capture different contributions. Specify both the pre-step state and the delay used for the second reading.
An AC measurement applies a changing stimulus and observes its response at a stated frequency or across frequencies. Impedance can have magnitude and phase, and a reported resistance-like number depends on the instrument's method. A single-frequency result is not a substitute for a complete frequency response. Keep the method label with the result.
For production comparison, select a repeatable procedure and a reference population relevant to the product. A numerical limit borrowed from another cell format, chemistry or test condition can reject good parts or accept unsuitable ones. Official instrument guidance, such as Tektronix's discussion of DCIR and AC methods, helps identify these measurement distinctions without providing a universal battery acceptance limit.
Separate the cell response from the connection
Use a measurement arrangement that makes the voltage boundary explicit. Current-carrying contacts and wires develop their own voltage drops. A separate sense connection at the intended terminals can reduce the inclusion of those drops, but contact placement, fixture repeatability and instrument configuration still matter.
Record whether the measurement covers a single cell, a module, a complete pack or a path that includes switching and protection electronics. These objects contain different interconnections. A result at an external connector should not automatically be described as the internal resistance of one cell. If that path includes a BMS switch or fuse, preserve that fact in the record.
Inspect contact condition and repeatability when results change unexpectedly. Repeating a test with the same poor connection can produce a consistent but misleading number. The fixture's maintenance and sense-lead arrangement belong to the procedure, along with instrument calibration and measurement range.
| Review item | What to establish |
|---|---|
| Method | DC step or AC method, with delay or frequency and acquisition settings. |
| Boundary | Cell, module, pack or external path including connectors and switches. |
| Connection | Separate sense location and repeatable current contacts. |
| Condition | Temperature, state of charge and prior rest/load history. |
| Interpretation | Defined comparison task; no unsupported capacity or health conversion. |
Two-point discharge resistance
Two-point discharge resistance
Use the current inputs and keep the assumptions
Load the example to inspect its units, then clear it before entering your own revision. Example values are deliberately labeled assumptions. Complete every field; an empty numeric input is not zero. Record the operating condition behind a value rather than copying the first number found on a component summary. For a comparison, keep the measurement boundary and units consistent.
Calculate after checking the inputs. Any edit invalidates the old result and disables its report download until you calculate again. An edited example remains identified as an example. Results and reports are generated locally without uploading a circuit or populating Contact. Attach the downloaded text manually if it helps explain the question. You can request a review directly without completing the tool.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Voltage at first current 繚 V | Terminal reading under I1 at a documented sampling time. |
| First discharge current 繚 A | Discharge is positive in this tool. |
| Voltage at second current 繚 V | Terminal reading after the step to I2, at the declared delay. |
| Second discharge current 繚 A | Must exceed I1. |
| Declared sample delay 繚 ms | Stored in the result; it does not correct electrochemical dynamics. |
Calculate a two-point DC discharge result
For this worksheet, discharge current is positive and the second current must exceed the first. Apparent resistance is (V1���V2)/(I2���I1). A first reading of 4.05 V at 1 A followed by 3.95 V at 3 A gives a 100 mV change over a 2 A current change, or 50 m峏. The declared sample delay is carried into the output as essential context.
The worksheet rejects a nonincreasing current or a nondecreasing voltage for this specific model. Such data can indicate a sign, timing, connection or state issue; the tool does not silently take an absolute value to make them appear valid. Other test conventions are possible, but they need their own explicitly defined equation and procedure.
No current pulse, state-of-charge range or timing in the example is a recommended test for an unknown battery. The calculation uses already recorded measurements. Select actual test conditions from the cell, equipment and product requirements, using a procedure appropriate to the energy and operating limits involved.

Keep timing, temperature and history with the number
The same battery can respond differently at different states of charge and temperature. Recent charging, discharging and rest history can also influence the observation. A comparison intended to identify a change should hold those conditions consistent or explain how their influence is handled.
Sampling time requires a precise reference. State whether the delay begins at a commanded current change or at an observed current transition, and whether voltage and current measurements are synchronized. Instrument settling and sampling filters can change the effective observation window. Store the waveform or acquisition settings when the application needs more than two summary points.
Do not compare a nominal one-second result with a ten-second result as if they were identical measurements. Likewise, an AC result without its frequency is incomplete. A carefully named column in a production record prevents later analysis from merging incompatible values into one apparent trend.
Interpret resistance alongside other evidence
Resistance can help describe voltage sag and power behavior under a relevant condition, but it is not a direct capacity measurement. A battery can exhibit changes in capacity and resistance that do not follow one universal relationship. Remaining runtime also depends on the load, voltage limits and the battery's actual condition.
Use the result to investigate a defined problem: unexpected voltage drop, a connection change, a production outlier or a trend under a controlled method. Check whether the measurement path and test conditions support that interpretation. Avoid presenting a single reading as a complete health percentage without a validated model and reference.
If the measurement electronics are being developed as a product, review ADC accuracy, current-source behavior, synchronization, range and protection independently. The digital thermometer circuit guide offers a related example of separating resolution from installed measurement uncertainty. More digits in a result do not reduce uncertainty in the inputs.
Specify a reproducible board or fixture test
For manufacturing, release the stimulus definition, connections, instrument configuration, timing, acceptance rule and record format together. If the fixture uses replaceable contacts, include their maintenance and verification requirements. Define how repeated tests are recorded so that an unfavorable first result is not erased by an untracked retry.
When a PCB assembly contains current-sense circuitry, an electrical substitution or known stimulus may verify part of the circuit without exercising a real battery. Keep that board-level test distinct from the cell or pack test. The two tasks need different equipment, risk controls and acceptance evidence.
For an inquiry, identify the measurement boundary and whether you need the sensing PCB manufactured, a fixture assembled or a defined test included. Provide schematic, BOM, quantity and the method you intend to use. The downloaded calculation report records the entered arithmetic and timing; it does not send an inquiry or establish that the physical measurement was performed correctly.
Keep a measurement result separate from a protection decision
A battery measurement has a location, timestamp, operating state and uncertainty. A limit has an authoritative source and an assigned response. Connect those two records explicitly before implementing a protection function. A monitor reading that appears plausible is not proof that every cell connection, temperature input or current path is valid.
Keep the cell manufacturer's operating requirements with the system design. Identify which circuitry remains active when the host is unavailable and which recovery actions require independent conditions. Configuration and calibration must be versioned as carefully as the PCB. When requesting assembly, state whether the work stops at the populated board or includes programming, calibrated measurements and a defined system test. A worksheet supports this discussion; it cannot authorize pack operation or turn an unknown requirement into a default threshold.
Standards, source context and limits
Use the exact device revision and application conditions when applying manufacturer guidance. Reference designs are evidence about a specified implementation, not automatic validation of a modified board. Workmanship inspection, functional verification, product safety and application performance are different acceptance tasks. Public summaries do not replace the applicable licensed standards or a project-specific acceptance specification.