勛圖tv

勛圖tv 繚 ENGINEERING GUIDE

KB-6160 FR-4: Datasheet, Tg and PCB Design Limits

Kingboard KB-6160 is a conventional, normal-Tg FR-4 laminate, paired with KB-6060 prepreg in the official technical sheet. The cited typical Tg is 138簞C by DSC. The older 150簞C wording retained in this page's URL is not the current specification presented here.

The official sheet also excludes applications requiring CAF resistance. This page makes that limitation visible and helps an engineer review material identity, hole geometry and manufacturing scope before requesting a quote.

Long bare circuit board with repeated plated holes
Long bare circuit board with repeated plated holes. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Correct the temperature callout at the source

Use the exact KB-6160/KB-6060 technical document for the proposed construction. Its typical data include Tg of 138簞C by DSC and Td of 310簞C at a 5% mass-loss criterion, with a 1.6 mm, eight-ply 7628 specimen context. These are different tests and neither is a continuous operating-temperature rating.

If a legacy drawing requires 150簞C under a defined method, do not assume this sheet satisfies that requirement. Resolve the difference with the design owner and supplier. Keeping an established URL does not justify retaining an incorrect numerical claim in the engineering content.

KB-6160 FR-4: separate the supplied layers
KB-6160 FR-4: separate the supplied layers. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Source-qualified material review

ItemPublished information or evidence statusDesign implication
Supply pairingKB-6160 / KB-6060Laminate and matching prepreg are different forms.
ClassificationConventional FR-4; normal TgThe A suffix does not independently prove halogen-free composition.
Tg / Td138簞C DSC / 310簞C at 5% mass loss, typicalThe legacy URL temperature is not a specification.
CAF restrictionOfficial sheet excludes applications requiring CAF resistanceDo not market the grade as anti-CAF.
Specimen1.6 mm, 8 �� 7628 for typical valuesPreserve exact construction and test conditions.

Respect the CAF application restriction

The official document states that the material is not suitable for applications requiring CAF resistance. Do not describe the grade as anti-CAF or infer reliability from ordinary FR-4 terminology. A biased-humidity requirement needs a suitable material and construction supported by the relevant evidence.

If the project has that requirement, raise it before procurement approval. Changing conductor spacing alone does not erase a supplier application exclusion. Keep the required test conditions and qualification scope with the alternative-material review.

Review itemWhat to establish
Temperature138簞C DSC typical; legacy URL text is not the specification.
CAF boundaryDo not use for a requirement the official sheet excludes.
Hole conventionDrilled or finished diameter with radial offset.
Model limitAnnular geometry is not finished-board acceptance.

Check the land and hole geometry consistently

The worksheet calculates half the land-to-hole diameter difference and subtracts radial center displacement. A 0.60 mm land, 0.30 mm evaluated hole and 0.05 mm offset leave 0.10 mm in the ideal geometry. This is a dimensional illustration, not an IPC minimum selected by the tool.

Declare whether the hole diameter is drilled or finished. Etch variation, plating and acceptance criteria need the actual drawing. A nonnegative geometric result does not establish manufacturability or override the material's application restrictions.

Stacked copper-clad laminate panels
Stacked copper-clad laminate panels. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Geometric annular-ring allowance

勛圖tv ENGINEERING

Geometric annular-ring allowance

Shengyi and Kingboard Material Planning
Loading Geometric annular-ring allowance…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Use the current inputs and keep the assumptions

Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.

After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.

If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.

InputWhat to establish before using it
Review referenceNonconfidential revision label.
Land diameter 繚 mmCircular ideal land.
Maximum evaluated hole diameter 繚 mmDeclare drilled or finished diameter consistently with the reviewed requirement.
Maximum center displacement 繚 mmRadial offset of hole center relative to land center; not a diameter tolerance.

Optional cost comparison from your own allowances

Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.

勛圖tv ENGINEERING

Optional project allowance comparison

Shengyi and Kingboard Material Planning
Loading Optional project allowance comparison…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Keep KB-6160 distinct from suffix variants

The KB-6160A page covers a separately named laminate and prepreg pairing. Similar headline values do not make the designations interchangeable. The KB-6167 review and KB-6165A verification page address different identity and thermal-data questions.

Ask the quote to identify the exact supplied grade, thickness basis, copper and bonding material. If another product is proposed, compare all requirements affected by the change. Preserve the decision with the released stackup rather than relying on a generic equivalent FR-4 phrase.

KB-6160 FR-4: radial offset reduces the ideal ring
KB-6160 FR-4: radial offset reduces the ideal ring. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Review assembly exposure and construction together

A conventional material may be considered for a range of ordinary rigid-board designs, but its suitability depends on the actual board and process. Record layer structure, holes, copper, soldering and anticipated repair exposures. Do not derive an allowable reflow count from Tg alone.

Use the supplier's current processing guidance and the fabricator's reviewed construction. If the design needs a different thermal or reliability route, change the material through a controlled decision. A low material allowance is not a reason to omit a fixed requirement.

Prepare a quote with the corrected requirement

Send the fabrication files, stackup, exact callout, quantity and any legacy temperature requirement that needs resolution. Identify permitted alternatives and requested evidence. Ask for a proposal that makes exceptions visible before production release.

The allowance tool separates one-time and recurring inputs supplied by you. It contains no verified market rates or inventory information. Use the PCB material directory for broader selection, while this page owns the verified KB-6160 data and its application boundary.

Close the material and construction decision together

The finished board combines a dielectric, copper patterns, holes, surface coatings and a manufacturing history. Its behavior cannot be inferred from a family name alone. State the supplied grade, reinforcement, thickness, copper and processing conditions that matter to the intended application.

Keep handling and assembly requirements with the fabrication drawing. A thin panel, punched outline or unusual support condition can change the production route even when the electrical circuit is simple. Ask the fabricator to review the actual features and panel format rather than assuming a dimensional example represents a production capability.

For cost comparison, hold the drawing, quantity, test scope and acceptance requirements constant. Record one-time tooling separately from recurring work, and distinguish raw material utilization from accepted-board yield. Any calculator on this page uses supplied assumptions; an actual quotation requires the files and an agreed scope.

A source-qualified table should be read alongside the exclusions and footnotes, not separated from them. If the supplier limits an application, identify whether that limitation affects the current design before requesting a price. A familiar family classification does not override an explicit restriction, and a positive calculator result cannot remove it.

For a repeat build, compare the newly proposed supply with the previously approved material record. Exact grade, manufacturing site where relevant, foil treatment, reinforcement and dimensional basis can matter. Define which changes require notification and which need technical approval. This avoids turning a purchasing substitution into an unnoticed design change.

Receiving records should support the agreed identity and traceability requirement. A certificate for a raw material, a finished-board inspection report and an assembly test result cover different boundaries. Request the records that actually answer the project questions rather than collecting unrelated certificates.

When a source contains conflicting values, keep the discrepancy visible until a controlled revision or written supplier response resolves it. Do not create a new table by combining the most favorable entries from several sources. The released drawing, material list and quotation should all describe the same accepted construction.

KB-6160 FR-4: review sequence
KB-6160 FR-4: review sequence. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Standards, source context and limits

Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.

The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.

KB-6160 FR-4: inquiry handoff
KB-6160 FR-4: inquiry handoff. Original explanatory diagram; conceptual, not a released circuit or inspection record.

For fabrication scope and the agreed construction requirements, see PCB manufacturing.