勛圖tv 繚 ENGINEERING GUIDE
Panasonic R-1566S: Automotive ECU Material Review
Panasonic R-1566S is a halogen-free multilayer material discussed for automotive ECU and power-control boards. The engineering task is to connect its material evidence to the actual board construction, assembly history and customer qualification requirements.
This page retains the S-grade focus. The Panasonic material hub provides the portfolio context; neither a manufacturer application example nor the word automotive certifies a finished board or equipment program.

Keep new and existing names distinct
The current manufacturer page lists new R-156AS and R-156YS designations alongside existing R-1566S. It attaches certain tracking statements to the new names and a thickness condition. Those statements should not be transferred to every R-1566S construction without confirmation.
Preserve the exact laminate and prepreg mapping, source revision and recognition scope. A proposed name change should appear as a reviewable supplier response, not an unnoticed edit to a controlled material callout.
Construction decisions at a glance
| Review focus | Established context | Design boundary |
|---|---|---|
| Names | Existing S and new AS/YS | Recognition and tracking scope differ. |
| Tg | 175簞C DSC context | Not maximum operating temperature. |
| Program | Actual mission profile | No generic automotive certification. |
Interpret thermal data by method
Panasonic reports a DSC Tg of 175簞C for the S-grade route in its technical information. That transition measurement is not a maximum continuous operating temperature. Decomposition, delamination and assembly endurance require their own conditions and evidence.
The HIPER D R-1755D guide offers a different material and thermal-expansion discussion. Compare the actual process history and construction, not only the relative size of two published Tg numbers obtained under different assumptions.
| Review item | What to establish |
|---|---|
| Mapping | R-1566S versus R-156AS/YS with exact scope |
| Thermal | Method and process history retained |
| Program | Customer-specific board and assembly evidence |
| Boundary | No automatic automotive qualification or CTI transfer |
Use the expansion illustration to frame a question
The worksheet models unconstrained thickness growth with entered coefficients below and above a simplified transition. Its sample gives 30 繕m for the stated 1.6 mm dielectric and 25簞C-to-200簞C heating scenario. The inputs are educational, not S-grade defaults.
Copper constraint, gradual transitions, hole geometry and fatigue are outside the calculation. It can show why a temperature interval matters, but it cannot approve a plated-hole design or predict the number of thermal cycles to failure.

Piecewise free thickness expansion
Piecewise free thickness expansion
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Initial dielectric thickness 繚 mm | Unconstrained specimen approximation. |
| Start temperature 繚 簞C | Must be less than final temperature. |
| End temperature 繚 簞C | Heating illustration only; not an approved exposure. |
| Assumed transition temperature 繚 簞C | Simplified sharp transition; use a defined measurement method. |
| CTE below transition 繚 ppm/簞C | Direction-specific value over the relevant interval. |
| CTE above transition 繚 ppm/簞C | Direction-specific value, not copied from in-plane CTE. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.
Optional project allowance comparison
Separate environmental mechanisms
The R-1566(W) guide addresses a distinct moisture and bias discussion. The HIPER C CAF guide explains why internal insulation and surface tracking must not be represented by the same claim.
Identify bias, humidity, contamination environment and the actual conductor geometry. Preserve test voltage, duration, sample preparation and failure criteria when using manufacturer examples. A published successful specimen is not a qualification of every ECU layout.
Plan evidence for the actual program
Define which raw-material declarations, finished-board inspections and assembly tests are required. Their boundaries differ. The fabricator should know which dimensions and interconnects control the product's acceptance and what records must accompany delivery.
Include the intended soldering sequence and permitted repair history. If the design uses a new material or stackup, agree the qualification work before treating the first production quote as an approved repeat build.
Submit an automotive material brief
Provide the exact R-1566S or proposed new designation, stackup, copper, hole geometry, board size, quantity and mission-profile requirements. State the customer acceptance scope and whether an alternative may be evaluated.
The optional cost worksheet can retain entered allowances for coupons, testing and qualification. It does not establish automotive certification, current availability or a binding price. A direct engineering inquiry is appropriate when the key question is recognition mapping or construction evidence rather than a numerical calculation.
Keep chemistry, insulation and assembly evidence separate
A laminate test, a finished-board qualification and an assembled-product validation address different boundaries. Preserve the specimen, conditioning, bias, temperature, geometry and observation interval with every result. A favorable value at one boundary cannot silently become approval of the whole product.
Separate a declaration of restricted substances from process compatibility and from service reliability. Keep customer-specific requirements and change-control obligations explicit. When a grade or construction changes, identify which evidence remains applicable and which work must be repeated.
For a manufacturing inquiry, provide the mission conditions, controlled drawings, material requirements and requested records. Mark unresolved qualification items as open. The worksheet can help organize evidence or compare a physical relationship, but it cannot certify compliance, predict lifetime or assign a universal safe operating limit.
A chemical declaration should identify the product and scope to which it applies. A report for a different grade, a broad company statement or a certificate with an unrelated construction cannot silently close a material requirement. Keep the customer criterion and the supplier evidence together so the comparison can be repeated when the supply changes.
Tracking performance, dielectric breakdown and geometric spacing are also different concepts. A CTI result is not a working-voltage rating. The equipment design must address its applicable insulation requirements, environment and geometry. A simple field or thickness calculation can illustrate one relationship without selecting a permissible clearance or certifying the assembled product.
Manufacturing restrictions deserve the same visibility as favorable properties. If a supplier excludes a repair or rework route, establish how the intended process will handle that condition before production. Do not rely on an after-the-fact material name change to justify a process that was never reviewed.
For an alternative material, identify all affected evidence streams. A candidate may satisfy the chemical criterion while requiring new electrical or thermal analysis. The final approval should state what was reviewed and which exceptions remain, rather than using a single vague compliance label for several different requirements.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.