R-5775(G) MEGTRON 6G: Copper and Channel Construction

R-5775(G), often described as MEGTRON 6G, should be specified with its E-glass construction and copper details. A short family name is not enough to reproduce a high-speed line. The practical goal is a material record that agrees with the complete channel model.

This page addresses the G construction. The Panasonic portfolio provides broader context, while the low-Dk and buried-resistor variants have separate tasks and should not be merged into this specification.

Stacked copper-clad laminate panels
Stacked copper-clad laminate panels. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Resolve conflicting table presentations

The global manufacturer portfolio distinguishes R-5775(G) from N-glass variants. One regional web entry inspected during research used repeated product naming and questionable units or dielectric fields. Do not copy those cells into a drawing without checking the controlled manufacturer sheet.

Use the original product documentation, construction table and supplier confirmation to establish the relevant data. A website display discrepancy is a reason to retain a source note, not a reason to invent a corrected value from memory.

R-5775(G) MEGTRON 6G: material and evidence boundary
R-5775(G) MEGTRON 6G: material and evidence boundary. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Construction decisions at a glance

Review focusEstablished contextDesign boundary
G routeE-glass constructionDo not import N values.
Source issueRegional table fields need verificationUse controlled manufacturer sheet.
ChannelBudget includes fixed lossesNo family-only speed promise.

Build a line model for the supplied construction

Record core thickness, pressed prepreg, glass style, resin content, copper profile and finished line geometry. These inputs determine whether a catalog material comparison is relevant to the actual route. An impedance target by itself does not identify the copper-loss assumption.

The R-5775(N) guide addresses the low-Dk-glass alternative. If the construction changes from G to N, review the geometry and timing model explicitly instead of assuming the same line width and all other parameters remain valid.

Review itemWhat to establish
SourceGlobal G identity and controlled sheet; flag web discrepancies
LineE-glass, copper profile and finished geometry
BudgetSame frequency and reference planes throughout
BoundaryNo automatic N, S or halogen-free substitution

Channel loss budget at one frequency

勛圖tv ENGINEERING

Channel loss budget at one frequency

Panasonic Material Engineering
Loading Channel loss budget at one frequency…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Use the current inputs and keep the assumptions

Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.

After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.

If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.

InputWhat to establish before using it
Review referenceNonconfidential revision label.
Allowed channel loss 繚 dBYour interface budget at a named frequency and reference planes.
Allocated connectors and transitions 繚 dBVerified or assumed allocation at the same frequency.
Reserved engineering margin 繚 dBProject allocation, not a standard default.
Measured or modeled routing loss 繚 dB/inComplete trace loss for the actual construction, including copper.
Routed length 繚 inchesSum along the agreed uniform routing model.

Optional cost comparison from your own allowances

Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.

勛圖tv ENGINEERING

Optional project allowance comparison

Panasonic Material Engineering
Loading Optional project allowance comparison…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Allocate the complete channel

The tool subtracts an entered routing contribution and fixed losses from a channel budget with reserved margin. The sample gives 2 dB remaining from a 20 dB budget after 5 dB fixed, 3 dB margin and 10 dB routing. These are educational values, not measured MEGTRON 6G performance.

Enter a complete routing-loss rate at the declared frequency. Df alone is not that rate. Keep connectors, packages and transitions in the model, and use the same reference planes when comparing a simulation with measured evidence.

Thin bare board held for visual inspection
Thin bare board held for visual inspection. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Treat chemistry changes as material changes

The R-5375 guide covers a halogen-free MEGTRON 6 route with its own E and N constructions. A chemical requirement may motivate considering it, but the change also needs thermal, dimensional and electrical review.

Request the exact declaration required by the customer and retain the proposed replacement identity. A commercial statement that two products are similar should not replace the controlled material callout or the engineering approval of a new construction.

R-5775(G) MEGTRON 6G: allocate the same 20 dB budget
R-5775(G) MEGTRON 6G: allocate the same 20 dB budget. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Keep special copper outside the ordinary assumption

The R-5775(S) buried-resistor page is relevant only when resistive foil is part of the circuit. Its sheet resistance, geometry and test requirements are additional construction details, not properties of an ordinary G-grade stackup.

Similarly, a low-profile foil description should identify the exact supplier data used in the loss model. Treat a proposed change in roughness or treatment as a potential electrical change, even if the nominal copper weight is unchanged.

Prepare an inquiry with a traceable baseline

Send the full material name, source revision, layer map, copper, dielectric dimensions, route lengths, frequency and loss allocation. Include the board size, quantity and required coupon or inspection scope. Flag any unresolved source-table discrepancy.

Compare prices only after the proposals describe the same deliverable. The optional allowance worksheet can retain user-entered costs and qualifications; it does not certify material authenticity, establish stock or replace a project-specific quotation.

Tie the exact grade to an electrical construction

State the channel reference planes, frequency range, routing length, copper construction, transitions and interface assumptions together. A laminate loss-tangent value is one input to that system. It is not a complete insertion-loss measurement or a guarantee that a data rate will work.

Use comparable measurement or modeling conditions when screening alternatives. Material changes can require geometry changes to preserve impedance, and copper roughness can alter the result independently of the resin system. Keep the proposed stackup and the channel analysis synchronized through fabrication review.

For procurement, identify the properties that are fixed and the alternatives that can be evaluated. Request evidence at the relevant construction and frequency rather than a broad low-loss label. Compare total delivered scope and validation effort alongside material price. A shorter or better-routed channel may change the tradeoff more than replacing a material name alone.

A useful design-data record retains both the material value and the reason it was selected. State whether the value is supplier characterization, a construction-specific design input, a measured coupon extraction or an early assumption. These sources are not interchangeable. Keep frequency, method and specimen information visible when a comparison uses more than one document.

The tool on this page starts empty because a plausible default can otherwise be mistaken for a verified grade profile. Use the example to understand the units, then replace it with project inputs. A result with many decimal places does not imply that the material or routing-loss input is known to that precision.

For a high-speed design, plan how the model will be checked. Reference planes, coupon geometry, fixtures and the acceptance boundary determine what a measurement means. A coupon that characterizes one line construction does not automatically qualify every route or transition on the board.

Keep the commercial comparison aligned with the engineering one. Quantity, copper, layer structure, test deliverables and qualification effort should be comparable. A lower material allowance can be irrelevant if the proposed construction cannot meet the channel requirement, while a premium grade may be unnecessary if the actual route already has sufficient validated margin.

R-5775(G) MEGTRON 6G: review sequence
R-5775(G) MEGTRON 6G: review sequence. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Standards, source context and limits

Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.

The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.

R-5775(G) MEGTRON 6G: inquiry handoff
R-5775(G) MEGTRON 6G: inquiry handoff. Original explanatory diagram; conceptual, not a released circuit or inspection record.

For fabrication scope and the agreed construction requirements, see PCB manufacturing.