Shengyi S1000-2 PCB: High-Tg Data and Revision Control

Shengyi S1000-2 is a high-Tg, lead-free-compatible laminate used with the corresponding S1000-2B prepreg. Its search results contain different Tg numbers, so a useful material review starts by identifying the controlled source rather than selecting the most favorable figure. S1000-2, S1000-2M and a drawing that says S1000-2H are not interchangeable names.

This guide focuses on thermal construction and revision control. The Shengyi material overview owns the broader supplier comparison, while this page helps turn a specific S1000-2 callout into a reviewable manufacturing requirement.

Bare multilayer circuit board with dense pad fields
Bare multilayer circuit board with dense pad fields. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Resolve the 170簞C and 180簞C descriptions

At the time of research, the cited official product page contains a 170簞C DSC headline while its property table lists 180簞C DSC and 185簞C DMA. This is a document-consistency issue, not permission to select whichever value fits a design. Obtain the current controlled TDS for the intended supplied grade and record the revision used for approval.

Keep typical characterization separate from purchase limits. A drawing requiring a minimum property needs an explicit acceptance basis; a typical table value is not automatically that limit. Preserve the source excerpt and supplier clarification with the drawing so that a repeat order does not reopen the same ambiguity.

Shengyi S1000-2 PCB: separate the supplied layers
Shengyi S1000-2 PCB: separate the supplied layers. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Source-qualified material review

ItemPublished information or evidence statusDesign implication
Tg documentationHeadline 170簞C versus table 180簞C DSC on the cited pageResolve controlled document revision before purchase.
Td345簞C, 5% mass loss, typicalKeep separate from Tg and service temperature.
Z expansion2.8%, 50���260簞C, typicalSpecimen characterization, not plated-hole life.
Supply pairingS1000-2 laminate / S1000-2B prepregDo not replace with 2M or 2H without review.

Treat the core and prepreg as different inputs

S1000-2 is the laminate designation and S1000-2B identifies its matched prepreg in the cited process documentation. A cured core and a B-stage bonding sheet enter lamination differently. Nominal prepreg thickness is not a guarantee of the final dielectric interval between patterned copper layers.

Specify the copper distribution, core thicknesses and intended finished separation. Thick internal copper and large clearance regions create a filling problem that cannot be solved by selecting a Tg alone. Where that is the actual issue, compare the task with SP175M special bonding prepreg; do not substitute products without a reviewed process and material decision.

Review itemWhat to establish
RevisionResolve the official-page Tg inconsistency with a controlled TDS.
PairingS1000-2 laminate and S1000-2B prepreg.
ConstructionCopper distribution, dielectric intervals and hole architecture.
Model limitNo life prediction or reflow approval from the worksheet.

Piecewise free thickness expansion

勛圖tv ENGINEERING

Piecewise free thickness expansion

Shengyi and Kingboard Material Planning
Loading Piecewise free thickness expansion…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Use the current inputs and keep the assumptions

Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.

After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.

If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.

InputWhat to establish before using it
Review referenceNonconfidential revision label.
Initial dielectric thickness 繚 mmUnconstrained specimen approximation.
Start temperature 繚 簞CMust be less than final temperature.
End temperature 繚 簞CHeating illustration only; not an approved exposure.
Assumed transition temperature 繚 簞CSimplified sharp transition; use a defined measurement method.
CTE below transition 繚 ppm/簞CDirection-specific value over the relevant interval.
CTE above transition 繚 ppm/簞CDirection-specific value, not copied from in-plane CTE.

Optional cost comparison from your own allowances

Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.

勛圖tv ENGINEERING

Optional project allowance comparison

Shengyi and Kingboard Material Planning
Loading Optional project allowance comparison…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Connect thermal properties to the actual build

The cited page reports typical Td of 345簞C at 5% mass loss and Z-axis expansion of 2.8% over 50���260簞C. These are specimen measurements. The finished board adds holes, copper constraints and a processing history. A board with several assembly or rework excursions may need different evidence from a simple single-pass build.

List anticipated lamination, soldering and repair exposures without turning them into an unapproved recipe. Ask which reliability coupons or records represent the proposed construction. A broad high-Tg description does not independently qualify a thick board, a high aspect-ratio hole or a sequential build.

Stacked copper-clad laminate panels
Stacked copper-clad laminate panels. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Illustrate expansion without pretending to predict life

The worksheet accepts thickness, starting and final temperatures, transition temperature and two CTE values. It integrates the entered intervals and reports free thickness change. Changing the temperature range can be as important as changing the material coefficient, which is why comparing isolated CTE figures is often misleading.

Use the example only to understand the arithmetic. It contains hypothetical values and does not preload a source-qualified S1000-2 material model. Actual interconnect stress requires the constrained geometry and copper behavior. A lower calculated free expansion does not establish a number of acceptable reflow cycles or a service-life advantage.

Shengyi S1000-2 PCB: integrate two assumed CTE intervals
Shengyi S1000-2 PCB: integrate two assumed CTE intervals. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Compare a neighboring grade through the drawing

The S1000 mid-Tg page covers a different material identity. If procurement proposes S1000-2M, obtain its own data and construction rather than carrying over the S1000-2 table. If a legacy drawing says S1000-2H, resolve that exact designation before treating it as an approved high-Tg or halogen-free alternative.

Build a comparison around the requirements that can change the board: dimensional basis, dielectric design input, copper treatment, hole architecture, process compatibility and required records. Similar names and similar headline Tg values are not a complete equivalence assessment.

Quote the released scope, not a material nickname

For an inquiry, provide the material callout, stackup, copper weights, drill information, quantity and application conditions. Identify permitted substitutions and who approves them. Request a quote that names the proposed grade and any unresolved source-revision issue instead of silently quoting generic FR-4.

The optional allowance tool separates one-time and recurring amounts supplied by you. It does not know material inventory, yield or current market prices. Compare equivalent inspection and acceptance scopes, then retain the agreed stackup and material record with the manufacturing files for future orders.

Close the material and construction decision together

The finished board combines a dielectric, copper patterns, holes, surface coatings and a manufacturing history. Its behavior cannot be inferred from a family name alone. State the supplied grade, reinforcement, thickness, copper and processing conditions that matter to the intended application.

Keep handling and assembly requirements with the fabrication drawing. A thin panel, punched outline or unusual support condition can change the production route even when the electrical circuit is simple. Ask the fabricator to review the actual features and panel format rather than assuming a dimensional example represents a production capability.

For cost comparison, hold the drawing, quantity, test scope and acceptance requirements constant. Record one-time tooling separately from recurring work, and distinguish raw material utilization from accepted-board yield. Any calculator on this page uses supplied assumptions; an actual quotation requires the files and an agreed scope.

A source-qualified table should be read alongside the exclusions and footnotes, not separated from them. If the supplier limits an application, identify whether that limitation affects the current design before requesting a price. A familiar family classification does not override an explicit restriction, and a positive calculator result cannot remove it.

For a repeat build, compare the newly proposed supply with the previously approved material record. Exact grade, manufacturing site where relevant, foil treatment, reinforcement and dimensional basis can matter. Define which changes require notification and which need technical approval. This avoids turning a purchasing substitution into an unnoticed design change.

Receiving records should support the agreed identity and traceability requirement. A certificate for a raw material, a finished-board inspection report and an assembly test result cover different boundaries. Request the records that actually answer the project questions rather than collecting unrelated certificates.

When a source contains conflicting values, keep the discrepancy visible until a controlled revision or written supplier response resolves it. Do not create a new table by combining the most favorable entries from several sources. The released drawing, material list and quotation should all describe the same accepted construction.

Shengyi S1000-2 PCB: review sequence
Shengyi S1000-2 PCB: review sequence. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Standards, source context and limits

Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.

The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.

Shengyi S1000-2 PCB: inquiry handoff
Shengyi S1000-2 PCB: inquiry handoff. Original explanatory diagram; conceptual, not a released circuit or inspection record.