勛圖tv 繚 ENGINEERING GUIDE
Shengyi S1150G Laminate: Halogen-Free Data and Construction
Shengyi S1150G is a halogen-free, mid-Tg laminate used with S1150GB prepreg. The valuable design detail is not just the halogen-free label: construction and thickness conditions can affect how a published property applies. A material selection should therefore preserve the exact grade, source revision and intended layer structure.
This page focuses on S1150G construction and purchasing requirements. It is separate from S1151G high-CTI review, whose process limitations and application guidance require their own assessment.

Read the qualified property table first
The cited S1150G technical sheet reports typical Tg of 155簞C by DSC, Td of 355簞C at 5% mass loss, and Dk/Df of 4.5/0.011 at 1 GHz. Its specimen context matters. These values are useful characterization, not a blanket guarantee for every available thickness and glass construction.
The official product information gives a CTI caveat tied to PLC 1 for a 7628 construction at thicknesses of at least 1.4 mm. Do not copy that statement onto a thin core of another glass style. Ask the supplier for evidence applicable to the actual supplied construction and keep that response with the requirement.
Source-qualified material review
| Item | Published information or evidence status | Design implication |
|---|---|---|
| Tg / Td | 155簞C DSC / 355簞C at 5% mass loss, typical | Do not infer continuous service limits. |
| Dk / Df | 4.5 / 0.011 at 1 GHz in the cited TDS | Method and construction travel with the values. |
| CTI caveat | PLC 1 context for ���1.4 mm, 7628 construction on cited product information | Ask about other thicknesses and glass styles. |
| Pairing | S1150G laminate and S1150GB prepreg | Keep form and pressed thickness distinct. |
Separate halogen, lead-free and insulation questions
Halogen composition, restricted-substance compliance and compatibility with a lead-free assembly process are different requirements. A declaration should identify the product, scope, date and applicable customer criterion. A thermal property cannot prove a chemical declaration, and a chemical declaration cannot approve a soldering profile.
This distinction is especially useful when a legacy drawing contains an ambiguous designation such as S1000-2H. A familiar family name is not evidence that a suffix meets the requested composition. Resolve the original callout before selecting a documented alternative.
| Review item | What to establish |
|---|---|
| Composition | Exact product and declaration scope; no suffix-based inference. |
| Construction | S1150G core and S1150GB prepreg; thickness measurement basis. |
| CTI condition | Verify applicability beyond the cited ���1.4 mm 7628 context. |
| Model limit | Copper-plus-dielectric sum is not final-board tolerance approval. |
Core supply thickness reconciliation
Core supply thickness reconciliation
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Cured dielectric thickness 繚 mm | Supplier basis excluding copper. |
| Top copper thickness 繚 繕m | As supplied, before inner-layer etching. |
| Bottom copper thickness 繚 繕m | As supplied, before inner-layer etching. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.
Optional project allowance comparison
Define thickness at the material boundary
The thickness tool adds copper cladding to an entered dielectric thickness. For a hypothetical 0.20 mm dielectric with 18 繕m copper on each side, the simple over-copper sum is 0.236 mm. This helps expose the difference between dielectric-only and total supplied-sheet dimensions.
The example is not an available S1150G construction. Actual supply tolerances and finished-board measurements need confirmation. When the core is etched, patterned copper and later bonding intervals become part of the stackup; a nominal sheet sum cannot predict the final board thickness by itself.

Match the prepreg to the planned build
Record S1150GB separately from the cured laminate. The pressed bondline depends on the selected construction and copper pattern, so a prepreg catalog thickness is not automatically the final dielectric gap. Ask for the fabricator's proposed ply arrangement and finished dimensions.
Keep impedance requirements and the approved electrical design input with that proposal. If a glass style or resin distribution changes, revisit the model rather than preserving trace widths by habit. Procurement, stackup and design files should identify the same revision when the order is released.
Evaluate alternatives without merging their identities
An alternative may change composition evidence, electrical properties, thermal behavior or processing. Compare these against the product requirements, not a single Tg or a material price. The KB-6160A review explains why a suffix alone cannot prove a halogen-free claim.
If the requirement is high tracking resistance, review the actual CTI method and construction before moving to a different material. CTI is not a permissible working voltage. Creepage, clearance, environment and the applicable equipment requirements remain separate design decisions.
Prepare the quotation with fixed and open choices
Send the grade and prepreg callout, dielectric thickness basis, copper, layer count, quantity and chemical-document requirements. Identify which alternatives can be proposed and who approves them. Include any evidence required for the exact thin or thick construction rather than requesting an unspecified compliance certificate.
The optional budget worksheet separates one-time and recurring allowances entered by you. It cannot determine stock, price validity or the cost of an unreviewed substitution. Request the actual quotation with the proposed stackup and resolve differences before fabrication begins.
Keep chemistry, insulation and assembly evidence separate
A laminate test, a finished-board qualification and an assembled-product validation address different boundaries. Preserve the specimen, conditioning, bias, temperature, geometry and observation interval with every result. A favorable value at one boundary cannot silently become approval of the whole product.
Separate a declaration of restricted substances from process compatibility and from service reliability. Keep customer-specific requirements and change-control obligations explicit. When a grade or construction changes, identify which evidence remains applicable and which work must be repeated.
For a manufacturing inquiry, provide the mission conditions, controlled drawings, material requirements and requested records. Mark unresolved qualification items as open. The worksheet can help organize evidence or compare a physical relationship, but it cannot certify compliance, predict lifetime or assign a universal safe operating limit.
A chemical declaration should identify the product and scope to which it applies. A report for a different grade, a broad company statement or a certificate with an unrelated construction cannot silently close a material requirement. Keep the customer criterion and the supplier evidence together so the comparison can be repeated when the supply changes.
Tracking performance, dielectric breakdown and geometric spacing are also different concepts. A CTI result is not a working-voltage rating. The equipment design must address its applicable insulation requirements, environment and geometry. A simple field or thickness calculation can illustrate one relationship without selecting a permissible clearance or certifying the assembled product.
Manufacturing restrictions deserve the same visibility as favorable properties. If a supplier excludes a repair or rework route, establish how the intended process will handle that condition before production. Do not rely on an after-the-fact material name change to justify a process that was never reviewed.
For an alternative material, identify all affected evidence streams. A candidate may satisfy the chemical criterion while requiring new electrical or thermal analysis. The final approval should state what was reviewed and which exceptions remain, rather than using a single vague compliance label for several different requirements.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.