Shengyi S1600 PCB: separate tracking resistance from insulation geometry

Understand S1600 high-CTI material, compare specified creepage and clearance with layout geometry, and prepare a manufacturing review.

Share your current requirements and open questions. Tool use is optional.

PCB photograph from the 勛圖tv S1600 article
Original PCB image used in the 勛圖tv S1600 article. Source-page association does not independently verify the laminate grade or an order qualification.

What is Shengyi S1600 PCB material?

Shengyi S1600 is a high-CTI rigid FR-4 material used when surface tracking is an important part of the material discussion. Its identity must be carried into the actual PCB construction and the product's insulation plan. CTI is a material test characteristic; it is not the board's allowable working voltage, required creepage distance or proof of internal insulation reliability.

Two supplier restrictions deserve attention before you request a build: the official S1600 page excludes anti-CAF applications and discourages solder-mask rework. If your product requires qualified internal CAF resistance, or your planned recovery process depends on stripping and replacing solder mask, bring that conflict into the material review immediately rather than treating it as a minor production note.

Understand the three different insulation questions

Creepage concerns the shortest relevant path along an insulating surface. Clearance concerns the shortest relevant air gap. Solid insulation concerns the dielectric system through the material. The product's safety requirements determine how these are evaluated; they cannot be collapsed into a single spacing number taken from a PCB material name.

A designer may add a slot to increase a surface path while leaving an air path largely unchanged. Components, mounting hardware, contamination and enclosure geometry can create a shorter path elsewhere. That is why the final assessment must consider the actual three-dimensional assembly, not only a two-dimensional copper-to-copper distance on one layer.

Creepage follows a surface; clearance crosses air
Concept diagram, not a standards-compliant slot design. Geometry around components, board edges and mounting hardware must also be considered.

The is an authoritative entry point for insulation-coordination standards and their revision history. Determine the applicable equipment standard, edition and jurisdiction with the responsible safety engineer. This page does not reproduce licensed spacing tables or choose a required distance for an unknown product.

Compare an approved spacing requirement with the layout

The worksheet below starts after the required distances have been established. Enter the required creepage and clearance, the minimum geometry found in your design, and the source of those requirements. Record the electrical and environmental context so the result remains interpretable when the drawing is reviewed later.

勛圖tv ENGINEERING

Shengyi S1600 PCB Engineering Planner

Shengyi Material Engineering
Loading Shengyi S1600 PCB Engineering Planner…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

An illustrative surface path of 5.4 mm against an entered requirement of 5.0 mm produces a difference of +0.4 mm. An air gap of 2.7 mm against 3.0 mm produces ���0.3 mm. The first result does not approve the insulation system; the second identifies a geometric shortfall against the number you supplied. Neither value is an IPC or IEC default.

Use minimum geometry that includes the appropriate manufacturing tolerances. If a routed slot is part of the requirement, account for its finished width, location and end radius. If a component body or connector forms part of a surface path, include its dimensional tolerances and the applicable treatment under the product standard. Keep a marked drawing with the worksheet.

S1600 material data with the method attached

CharacteristicSupplier referenceInterpretation
Tg135簞C, DSCA typical transition result, not continuous service temperature
CTIAt least 600 V; product table also identifies PLC 0Tracking-test classification, not a working-voltage rating
Td310簞C, TGA at 5% mass lossA decomposition test result
Total Z expansion4.5%, 50���260簞CA specified interval; do not apply to a different range
FlammabilityV-0 in the published tableVerify the applicable material construction and recognition scope

These selected facts come from . Typical material data do not establish finished-board acceptance. The material reference and the order specification should state the required characteristic, evidence and construction rather than relying on a marketing label such as ���high voltage PCB.���

For a design driven primarily by thermal transition, the Tg135 PCB guide addresses that different search task. The Shengyi material overview helps compare the family without implying that one grade can replace another solely because it has a higher Tg.

High CTI does not imply anti-CAF performance

Surface tracking and conductive anodic filament growth concern different paths and mechanisms. A favorable tracking result cannot be substituted for internal electrochemical reliability evidence. This distinction is especially important when a circuit combines high voltage, humid exposure and densely spaced drilled holes. The material review must address all relevant requirements together.

Surface tracking and internal CAF are different tasks
Tracking performance and CAF resistance cannot be substituted for each other. The paths are explanatory, not test results.

For S1600, the supplier's explicit anti-CAF exclusion is more useful than a generic claim about ���excellent insulation.��� If anti-CAF performance is part of the released requirement, ask for a suitable alternative system and a qualification plan. Do not infer that another grade is acceptable merely because its data sheet uses the phrase anti-CAF; the actual construction, process and test conditions still need review.

A different design may legitimately focus on tracking resistance and manageable surface geometry, with a separate product qualification program. In that case, document why S1600 is being considered and which requirements remain open. This makes the material choice transparent to both procurement and the person signing off the insulation design.

Design the PCB around the insulation paths

Start with a marked isolation drawing showing the relevant conductor groups, connectors, mounting features and board edges. Identify slots and keepouts that have an insulation function rather than leaving the fabricator to infer their purpose. Distinguish those features from ordinary routing reliefs so later panelization or tooling changes do not accidentally alter the design intent.

Review copper on every layer that can affect the insulation arrangement. A generous top-layer separation is not a complete description of a multilayer board. Plated holes, exposed pads, internal planes and edge metallization can change the geometry. Keep the fabrication stackup, assembly drawing and product insulation diagram consistent through each revision.

Determine the requirement before checking the layout
The worksheet compares entered requirements with entered dimensions. It does not derive a safe spacing from CTI or voltage.

In a power-control application, the isolation boundary may pass near a current-carrying region. Increasing copper or adding thermal connections can improve one part of the electrical design while reducing an insulation margin elsewhere. Review those changes together. The power PCB design page covers the broader current, thermal and layout task without redefining the material's CTI rating.

Agree processing and rework expectations before release

The manufacturer's processing guidance belongs in the construction review, especially where the selected resin system differs from a previously qualified board. Confirm the core and bonding material identities, available thicknesses, copper, finished geometry and required records. Do not turn a general material description into an assumed factory process window.

Discuss solder-mask rework explicitly because the S1600 supplier discourages it. A production plan should state how nonconforming mask will be handled and who can authorize a deviation. This is different from assuming that all local assembly rework is prohibited; the process, thermal exposure and applicable restrictions must be identified precisely.

If the assembly contains parts close to the insulation boundary, verify the final placement and solder geometry as well. Lead protrusion, a solder feature or a misplaced part can change the actual path. The bare-board drawing remains necessary, but the assembled product requires its own assessment and inspection criteria.

勛圖tv bare-board electrical test equipment
勛圖tv electrical-test equipment photograph. Continuity/isolation testing and material reliability qualification have different purposes; this image makes no test-coverage claim.

Specify evidence without confusing electrical tests

Bare-board continuity and isolation testing can check the manufactured circuit against its netlist under agreed conditions. It does not automatically establish long-term tracking behavior, product dielectric withstand or environmental qualification. Specify each required test by purpose so a quotation does not imply that one standard production test covers every insulation question.

Use the bare-board electrical testing page to organize the production netlist test. Separately identify the product qualification owner, samples, environmental conditions, voltage program, acceptance criteria and reports. Where a safety approval depends on recognized materials or constructions, confirm the current scope with the appropriate authority before release.

Retain the material identity and relevant dimensional records with the fabrication revision. If the supplier proposes a different material, require a documented comparison against the insulation plan. A similar CTI entry is not sufficient evidence that the substitute has identical thermal, processing or qualification characteristics.

What affects an S1600 PCB quotation?

The quotation should reflect the specific material construction and the features needed to preserve the insulation geometry. Slots, routing tolerances, panel utilization, copper distribution, special documentation and an agreed verification program can change the scope. There is no universal percentage premium that correctly prices all high-CTI boards.

Request comparable quantities and define what is included in each offer. Separate bare-board fabrication from component assembly and product certification work. If an insulation requirement is still provisional, request a technical review with the uncertainty clearly stated; a precise price for an undefined safety-critical feature is not a useful procurement result.

勛圖tv ENGINEERING

Shengyi S1600 PCB Budget Brief

Shengyi Material Engineering
Loading Shengyi S1600 PCB Budget Brief…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

This worksheet can export the technical brief with all costs blank. If you have dated allowances, enter a per-board amount, setup amount and verification amount on the same currency and scope basis. The resulting allocation is transparent arithmetic, not a current market quote. Send the brief with the marked isolation drawing through the direct Contact link.

S1600 PCB questions

Does CTI 600 mean that the PCB can operate at 600 V?

No. CTI describes a particular tracking-test characteristic. The working voltage and required insulation geometry depend on the product, environment and applicable standard. Keep working voltage, impulse requirements, creepage, clearance and solid-insulation requirements as separate fields in the design review.

Can S1600 be used when anti-CAF performance is mandatory?

The linked supplier product page states that S1600 is not suitable for anti-CAF applications. Treat that as a material-selection conflict requiring resolution. Do not replace the requirement with a CTI statement or assume that a wider surface gap answers the internal reliability question.

Will adding a slot always solve a spacing problem?

No. Its effect depends on the relevant path, finished geometry, surrounding components and the applicable standard's treatment of grooves and slots. Check the minimum surface and air paths separately, include manufacturing tolerances and review the complete assembly instead of approving a slot from this schematic illustration.

What makes an enquiry ready for engineering review?

Include the fabrication data, marked insulation boundary, required distances and their source, working and impulse voltage context, environment, material requirement, quantities and requested evidence. List unresolved items explicitly. A well-scoped review can begin before the final design is complete, without suggesting that provisional values are already approved.

Request S1600 PCB manufacturing review

Send the named laminate and prepreg, drawing revision, stackup, quantities and required evidence. Identify open material, construction or qualification questions so engineering can prepare a useful manufacturing proposal.