Shengyi SF302: Adhesive Flex Stack and Legacy Data
Shengyi SF302 is identified in historical manufacturer literature as a three-layer, adhesive-based polyimide FCCL. It should not be reclassified as adhesiveless simply because its base film is polyimide. This page helps recover the complete ordering construction and carry it into a reviewable flex stack.

Read every field of the supply code
The historical code structure identifies film gauge, foil gauge, adhesive dimension, sidedness and foil type. Preserve those fields from the original order or drawing. A shortened SF302 label cannot tell the fabricator whether one or two copper faces are required. Ask for a current supplier document before treating an older construction table as an available stock list.
Construction and decision boundaries
| Review item | What this page establishes | What remains project-specific |
|---|---|---|
| Historical form | Three-layer adhesive FCCL | Not adhesiveless. |
| Full code | Film, copper, adhesive, sidedness and foil | Preserve all required fields. |
| Current release | Supplier-controlled construction | Legacy listing is not stock confirmation. |
Represent adhesive explicitly
Draw the bonding layer between copper and polyimide. For a double-sided adhesive construction, account for the bonding on both sides as applicable to the supplied product. Additional protective film or interlayer bonding is separate. The stack worksheet supports named entries so that an unexplained dielectric total does not conceal missing layers.
| Review item | What to establish |
|---|---|
| Complete code | Film, foil, adhesive, sides and copper type |
| Layers | Every bonding layer in the relevant region |
| Legacy review | Original evidence and current supplier response |
| Limit | No automatic equivalence to SF305 or adhesiveless FCCL |
Use regional sections for useful dimensions
The connector tail, bend span and reinforced island may have different coverings and supports. Record a thickness basis at each measurement point. The worksheet sums nominal and limit dimensions; it does not model compression, local resin flow or a statistical process distribution. Confirm the proposed cured section with the manufacturer before setting acceptance limits.

Stackup thickness interval sum
Stackup thickness interval sum
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Layer entries 繚 CSV | All dimensions in mm. Use each physical thickness once. Minus and Plus are positive absolute deviations, not percentages. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.
Optional project allowance comparison
Compare historical and current evidence
SF305 is a separate material identity and cannot be assumed equivalent from the number sequence. An unresolved ITEQ IF-E callout needs its own source recovery. The VN legacy-film guide explains why a historical designation should be preserved until a controlled replacement decision is made. A missing current catalog entry is not proof that the original product never existed.
Plan the circuit-specific checks
Define the electrical layer data, copper finish, bend duty and assembly exposure. For a static folded part, show the installed shape and support. For repeated motion, ask for a representative qualification route. A material property table does not establish the cycle life of a patterned, covered and assembled circuit with local stress concentrations.
Prepare a legacy-repeat RFQ
Send the complete old code, source revision, previous approved stack where available and the features that must remain unchanged. Ask the supplier to identify the offered material and any proposed change before pricing production. Separate trial and documentation work from recurring fabrication so that the cost comparison does not hide an unresolved material substitution.
Release the material with its finished flex construction
The full flex laminate designation can include film gauge, foil gauge, adhesive thickness, sidedness and foil type. Preserve the complete code on procurement records. Regional web tables and older documents can differ in conditions or transcription; resolve a disagreement against the controlled sheet rather than choosing the more favorable number. The exact material and the complete finished-board requirements must both be reviewed.
Start the release drawing with the shape the circuit will occupy in the product. Show the flat outline, assembled position, motion envelope and regions that must remain flat. Identify installation folds separately from movement during service. A flex that is bent once to clear an enclosure has a different verification problem from a cable that moves on every operating cycle. State the mechanism, travel, speed, temperature and expected duty rather than writing only flexible PCB.
Then define each cross-section that actually exists. The bend span, connector tail, component island and rigid transition may have different copper, coverlay, adhesive and stiffener layers. A single finished-thickness number cannot describe all of them. Indicate the measurement locations and include tolerances where fit or electrical behavior depends on them. Ask the fabrication team to return the proposed construction for approval before it becomes a purchasing assumption.
Copper deserves its own record. Distinguish supplied foil from copper remaining after imaging, etching and plating. Identify which surfaces receive additional metal and whether the bending region is plated. The foil process label alone does not establish fatigue life: thickness, grain direction, surface treatment, pattern shape and mechanical restraint also affect the construction. Do not select a copper variant solely because a comparison table calls it the premium option.
Choose verification coupons to reproduce the critical feature. A flat electrical coupon can check continuity or a specified transmission geometry; it does not reproduce repeated motion around a hinge. A bend specimen needs the relevant stack, trace layout, radius definition, temperature, cycling method and failure criterion. Monitor the failure mechanism of interest and keep the sample count with the result. A successful demonstration is useful evidence, but its scope must remain attached to it.
Review assembly as part of the material decision. Components and connectors impose local mass and force, and the support tooling changes how a flexible panel moves during printing, placement and heating. State component keep-out regions, supported areas and the sequence in which temporary supports are removed. A material thermal test is not the oven profile for the populated assembly. Moisture conditioning and permitted thermal exposure need a product-specific instruction.
For purchasing, separate the recurring board cost from tooling, fixtures and qualification. Compare the same quantity, panel assumptions, copper, surface finish, inspection and delivery format. An inexpensive laminate can become an expensive assembly if it requires extra handling or poor nesting. Conversely, a more elaborate stack should solve a stated need; adding layers or thicker copper without an electrical or mechanical reason can create unnecessary work.
Prepare a concise inquiry package even when some inputs are unknown. Include the schematic or connection requirement where relevant, fabrication data, stack sections, mechanical drawing, quantity and a short list of open decisions. Mark exact-material requirements separately from permitted alternatives. Keep the previous approved revision available for repeat builds. The engineering conversation can start with an incomplete stack, provided the missing items are explicit and no unapproved substitution is presented as settled.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. For a flex board, distinguish the design requirements in IPC-2223, finished-board qualification and performance in IPC-6013, and the material scopes of IPC-4202, IPC-4203 and IPC-4204. These cover different deliverables; naming them does not certify the material or factory. State the contracted revision and applicable material sheet. Source review date: 3 October 2026. Legacy designation, present availability and an approved replacement are separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.