Shengyi SF302: Adhesive Flex Stack and Legacy Data

Shengyi SF302 is identified in historical manufacturer literature as a three-layer, adhesive-based polyimide FCCL. It should not be reclassified as adhesiveless simply because its base film is polyimide. This page helps recover the complete ordering construction and carry it into a reviewable flex stack.

Repeated flexible circuit outlines in a production panel
Repeated flexible circuit outlines in a production panel. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Read every field of the supply code

The historical code structure identifies film gauge, foil gauge, adhesive dimension, sidedness and foil type. Preserve those fields from the original order or drawing. A shortened SF302 label cannot tell the fabricator whether one or two copper faces are required. Ask for a current supplier document before treating an older construction table as an available stock list.

Shengyi SF302: distinguish the physical layers
Shengyi SF302: distinguish the physical layers. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Construction and decision boundaries

Review itemWhat this page establishesWhat remains project-specific
Historical formThree-layer adhesive FCCLNot adhesiveless.
Full codeFilm, copper, adhesive, sidedness and foilPreserve all required fields.
Current releaseSupplier-controlled constructionLegacy listing is not stock confirmation.

Represent adhesive explicitly

Draw the bonding layer between copper and polyimide. For a double-sided adhesive construction, account for the bonding on both sides as applicable to the supplied product. Additional protective film or interlayer bonding is separate. The stack worksheet supports named entries so that an unexplained dielectric total does not conceal missing layers.

Review itemWhat to establish
Complete codeFilm, foil, adhesive, sides and copper type
LayersEvery bonding layer in the relevant region
Legacy reviewOriginal evidence and current supplier response
LimitNo automatic equivalence to SF305 or adhesiveless FCCL

Use regional sections for useful dimensions

The connector tail, bend span and reinforced island may have different coverings and supports. Record a thickness basis at each measurement point. The worksheet sums nominal and limit dimensions; it does not model compression, local resin flow or a statistical process distribution. Confirm the proposed cured section with the manufacturer before setting acceptance limits.

Flexible circuit with reinforced local end regions
Flexible circuit with reinforced local end regions. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Stackup thickness interval sum

勛圖tv ENGINEERING

Stackup thickness interval sum

Flexible Material Engineering
Loading Stackup thickness interval sum…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Use the current inputs and keep the assumptions

Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.

After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.

If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.

InputWhat to establish before using it
Review referenceNonconfidential revision label.
Layer entries 繚 CSVAll dimensions in mm. Use each physical thickness once. Minus and Plus are positive absolute deviations, not percentages.

Optional cost comparison from your own allowances

Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.

勛圖tv ENGINEERING

Optional project allowance comparison

Flexible Material Engineering
Loading Optional project allowance comparison…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Compare historical and current evidence

SF305 is a separate material identity and cannot be assumed equivalent from the number sequence. An unresolved ITEQ IF-E callout needs its own source recovery. The VN legacy-film guide explains why a historical designation should be preserved until a controlled replacement decision is made. A missing current catalog entry is not proof that the original product never existed.

Shengyi SF302: worksheet boundary
Shengyi SF302: worksheet boundary. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Plan the circuit-specific checks

Define the electrical layer data, copper finish, bend duty and assembly exposure. For a static folded part, show the installed shape and support. For repeated motion, ask for a representative qualification route. A material property table does not establish the cycle life of a patterned, covered and assembled circuit with local stress concentrations.

Prepare a legacy-repeat RFQ

Send the complete old code, source revision, previous approved stack where available and the features that must remain unchanged. Ask the supplier to identify the offered material and any proposed change before pricing production. Separate trial and documentation work from recurring fabrication so that the cost comparison does not hide an unresolved material substitution.

Release the material with its finished flex construction

The full flex laminate designation can include film gauge, foil gauge, adhesive thickness, sidedness and foil type. Preserve the complete code on procurement records. Regional web tables and older documents can differ in conditions or transcription; resolve a disagreement against the controlled sheet rather than choosing the more favorable number. The exact material and the complete finished-board requirements must both be reviewed.

Start the release drawing with the shape the circuit will occupy in the product. Show the flat outline, assembled position, motion envelope and regions that must remain flat. Identify installation folds separately from movement during service. A flex that is bent once to clear an enclosure has a different verification problem from a cable that moves on every operating cycle. State the mechanism, travel, speed, temperature and expected duty rather than writing only flexible PCB.

Then define each cross-section that actually exists. The bend span, connector tail, component island and rigid transition may have different copper, coverlay, adhesive and stiffener layers. A single finished-thickness number cannot describe all of them. Indicate the measurement locations and include tolerances where fit or electrical behavior depends on them. Ask the fabrication team to return the proposed construction for approval before it becomes a purchasing assumption.

Copper deserves its own record. Distinguish supplied foil from copper remaining after imaging, etching and plating. Identify which surfaces receive additional metal and whether the bending region is plated. The foil process label alone does not establish fatigue life: thickness, grain direction, surface treatment, pattern shape and mechanical restraint also affect the construction. Do not select a copper variant solely because a comparison table calls it the premium option.

Choose verification coupons to reproduce the critical feature. A flat electrical coupon can check continuity or a specified transmission geometry; it does not reproduce repeated motion around a hinge. A bend specimen needs the relevant stack, trace layout, radius definition, temperature, cycling method and failure criterion. Monitor the failure mechanism of interest and keep the sample count with the result. A successful demonstration is useful evidence, but its scope must remain attached to it.

Review assembly as part of the material decision. Components and connectors impose local mass and force, and the support tooling changes how a flexible panel moves during printing, placement and heating. State component keep-out regions, supported areas and the sequence in which temporary supports are removed. A material thermal test is not the oven profile for the populated assembly. Moisture conditioning and permitted thermal exposure need a product-specific instruction.

For purchasing, separate the recurring board cost from tooling, fixtures and qualification. Compare the same quantity, panel assumptions, copper, surface finish, inspection and delivery format. An inexpensive laminate can become an expensive assembly if it requires extra handling or poor nesting. Conversely, a more elaborate stack should solve a stated need; adding layers or thicker copper without an electrical or mechanical reason can create unnecessary work.

Prepare a concise inquiry package even when some inputs are unknown. Include the schematic or connection requirement where relevant, fabrication data, stack sections, mechanical drawing, quantity and a short list of open decisions. Mark exact-material requirements separately from permitted alternatives. Keep the previous approved revision available for repeat builds. The engineering conversation can start with an incomplete stack, provided the missing items are explicit and no unapproved substitution is presented as settled.

Shengyi SF302: review sequence
Shengyi SF302: review sequence. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Standards, source context and limits

Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.

The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. For a flex board, distinguish the design requirements in IPC-2223, finished-board qualification and performance in IPC-6013, and the material scopes of IPC-4202, IPC-4203 and IPC-4204. These cover different deliverables; naming them does not certify the material or factory. State the contracted revision and applicable material sheet. Source review date: 3 October 2026. Legacy designation, present availability and an approved replacement are separate questions.

Shengyi SF302: inquiry handoff
Shengyi SF302: inquiry handoff. Original explanatory diagram; conceptual, not a released circuit or inspection record.

For fabrication scope and the agreed construction requirements, see PCB manufacturing.