Bergquist Aluminum PCB Price: Grade, Panel Yield and Quote Scope
Bergquist aluminum PCB price depends on the exact material grade and finished board construction, not just the brand name or board area. Copper, dielectric thickness, metal base, routing, usable panel layout and verification can all change the scope being purchased.
This page helps buyers compare quotations and plan a cost scenario. The panel calculator uses allowances entered by you and labels yield as an assumption. It contains no live supplier prices and does not issue a 勛圖tv quotation.

IMS panel-to-good-board cost scenario
IMS panel-to-good-board cost scenario
Use the current inputs and keep the assumptions
Start with the physical boundary named above the inputs. Enter your own values, or select Load example to explore the labeled teaching case. Example mode stays visible after edits so an illustrative calculation is not mistaken for measured project data. Clear for my inputs removes the sample values and starts a separate record.
Generate the result after completing every field. Changing any input invalidates the previous output and disables its download until you calculate again. Read the limitations below the numbers: a geometric or arithmetic result does not qualify a material, approve a circuit or establish manufacturing capability.
Download the current result if it helps the review. The text file contains inputs, outputs, assumptions and the tool version. It stays on your device; attach it manually to an enquiry if useful. No CAD is uploaded or interpreted, and nothing is automatically inserted into the Contact form. You can request an engineering review without completing this tool.
| Input | What to establish before using it |
|---|---|
| Review reference | Use a nonconfidential scope or revision. |
| Currency | All figures use one currency; no exchange conversion. |
| Required good boards | Whole quantity, same approved construction. |
| Entered processed-panel allowance | Your quotation or labeled planning assumption; no market rates. |
| Nominal pieces per panel | Whole count; usable area, tabs and nesting established separately. |
| Assumed yield 繚 percent | Greater than zero and at most 100; not a measured result. |
| One-time allowance | Include only costs absent from the panel allowance. |
Identify the material before asking for price
State the exact grade, revision and dielectric thickness, together with the base and copper requirements. If a drawing allows equivalents, define how equivalence will be reviewed. A quote using another dielectric is a technical alternative, not automatically the same item at a lower price.
Use the material-role comparison guide before treating brand names as interchangeable. Keep the grade's thermal and electrical evidence with the construction schedule. A purchasing description should preserve the properties used in the design decision.
Define the finished-board scope
Provide board outline, holes, copper pattern, finish, mask, thickness and tolerances. Special machining, isolated holes or unusually dense features can affect processing. The material sheet is only one input to the delivered board.
Distinguish bare-board fabrication from assembly, thermal-interface installation and housing work. If several suppliers quote different boundaries, separate those boundaries before comparing the totals. A low price with omitted operations is not evidence of a more efficient equivalent route.
| Review item | What to establish |
|---|---|
| Material | Exact grade, thickness and alternative policy. |
| Panel | Reviewed utilization, not simple area division. |
| Cost | Recurring panel allowance and one-time scope separated. |
| Yield | Planning assumption retained; good-board delivery not guaranteed by arithmetic. |
Review panel utilization
Usable pieces per panel depend on outline, spacing, process margins, tooling and handling. Dividing nominal sheet area by board area can overstate utilization. Odd shapes and mounting features may change the nesting options.
The calculator accepts an established pieces-per-panel count; it does not solve nesting. Ask the manufacturer to review the actual drawing and panel proposal. Preserve a changed count as a changed assumption rather than silently using a more favorable number.

Keep yield an explicit assumption
The model estimates panels as required good boards divided by nominal pieces per panel and assumed yield, rounded up to whole panels. For 100 good boards, eight pieces per panel and 90 percent assumed yield, it budgets 14 panels.
At an entered 60 currency units per panel and 150 setup allowance, the total scenario is 990, or 9.90 per required good board. This is arithmetic from invented inputs. Yield is an expected planning fraction, not a guarantee that 14 panels will deliver exactly 100 acceptable pieces.
Separate recurring and one-time costs
Tooling, engineering preparation, qualification samples and fixtures may be charged separately from repeat production. Record whether a per-panel figure already includes any of those items. Avoid adding the same setup twice through both the panel allowance and a separate field.
For repeated orders, compare the same revision and approval state. A repeat build after a material or outline change may need additional review. Do not assume that every item labeled setup is permanently eliminated on later orders.
Include evidence and acceptance
The quotation should identify agreed inspection, electrical tests, material traceability and records. More extensive evidence can change the commercial scope. A price comparison that omits those requirements may lead to an unusable sourcing decision even if the boards look similar.
Where thermal performance is a project requirement, define the construction and test boundary rather than asking for a generic conductivity certificate. The Bergquist versus FR-4 comparison shows how to keep that boundary consistent across alternative architectures.
Handle lead time and substitutions transparently
Ask which material and process assumptions support the offered schedule. Keep proposed substitutions subject to technical review. A shorter quoted lead time can have different implications when it relies on an alternative grade or a changed construction.
Record prototype timing separately from repeat demand. If the design is not frozen, identify the decision date and the information needed to firm the quote. This helps prevent an early budget allowance from being mistaken for a committed production offer.
Send a complete quote request
Provide controlled fabrication files, stack and grade schedule, quantity, finish, outline, acceptance scope and delivery requirements. Include the material alternatives you are willing to review and the requirements that cannot change.
Continue to metal-core PCB manufacturing for a construction proposal. The exported scenario remains on your device and can be attached manually. Customers can request a quotation directly without completing the calculator.
Normalize quotations before interpreting the price
Write a common request that specifies construction, quantity, panel assumptions, delivery boundary and acceptance evidence. Ask each quotation to identify inclusions, exclusions and proposed alternatives. A low total cannot be interpreted fairly until those boundaries match.
Separate one-time work from recurring production and identify any yield or utilization assumptions. A deterministic planning calculation is useful for sensitivity analysis, but it does not establish the probability of delivering a target quantity. Development trials and qualification should remain visible costs when they are required.
Use current written proposals for procurement decisions. The worksheet contains no live material rates, exchange-rate feed or automatic stock check. Keep the source and date of entered allowances in your project records and revise the scenario when technical scope changes.
Before release, place the chosen requirement, the proposed construction and the evidence in one review record. Separate measured values from supplier nominal data and from your own assumptions. If a value is unknown, identify who will obtain it and what decision depends on it. An empty field is more honest and more useful than an invented typical figure.
During an A/B comparison, change one relevant variable where possible. Preserve the original inputs and the reason for the change. If several things change together, describe the result as a comparison between complete configurations. Do not attribute the entire difference to one material or geometry feature without supporting evidence.
For a repeat order, confirm that the relevant drawing, material and process revisions still match the accepted configuration. Record alternatives explicitly. This small discipline helps purchasing avoid an apparently equivalent substitution that changes the engineering basis of the original decision.
Standards, source context and limits
Use the actual applicable document and edition for contractual requirements. Public technical resources help explain methods, but do not reproduce every condition in a licensed standard or qualify a particular 勛圖tv construction. Retain exact grades and test boundaries when reading supplier data.
The numeric examples on this page are illustrative inputs unless specifically identified otherwise. Archive photographs show relevant physical context; they are not current equipment, material-grade or inspection evidence. Original drawings explain the models and are not production drawings. Ask for the evidence and acceptance scope needed for your project rather than inferring approval from an image or calculator result.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.