勛圖tv 繚 ENGINEERING GUIDE
ITEQ IT-170GT PCB: Channel Length and Loss Budget
ITEQ IT-170GT selection is most useful when it is tied to a routing-length and loss requirement. A high-speed design needs a complete channel allocation, not a laminate name standing in for a data-rate guarantee. This page helps turn the electrical requirement into a construction-specific discussion.
The ITEQ material hub covers family selection. Here the focus is plain IT-170GT, including the remaining routing budget after other channel elements and margin have been accounted for.

Distinguish GT from GRA2
The current ITEQ introduction lists IT-170GT separately, with headline Dk 3.90 and Df 0.0095 on the chart's 50% resin-content basis. Keep the exact sheet, frequency and method with any design value. A chart entry cannot describe every available dielectric construction.
For a matched cost-versus-loss comparison, visit IT-170GRA2. Do not treat the two names as interchangeable or assume the digits imply a common resin and reinforcement. The proposed stackup needs its own electrical model.
Material facts and decision boundaries
| Item | Source or model context | What it does not establish |
|---|---|---|
| Current chart | Dk 3.90 / Df 0.0095, RC 50% | Not a universal layer model. |
| Length example | 12 dB /1 dB per inch =12 inches | Conditional arithmetic. |
| Interface | Other criteria remain | No bitrate approval. |
Define the loss boundary at a named frequency
Start with the interface's actual reference planes and allowable loss. Identify which package, connector and via effects are included. An allocation measured between board launches cannot be mixed casually with one that includes packages or test fixtures.
Reserve the chosen engineering margin explicitly. A positive remainder means only that the entered allocations leave arithmetic room for routing. Return loss, crosstalk, skew and other interface criteria may still govern the design independently of insertion loss.
| Review item | What to establish |
|---|---|
| Exact grade | IT-170GT and proposed copper construction. |
| Loss boundary | Same frequency and reference planes throughout. |
| Length input | Complete measured or modeled routing loss. |
| Model limit | Conditional length is not a bitrate guarantee. |
Routing length from remaining loss allocation
Routing length from remaining loss allocation
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Allowed loss 繚 dB | Same frequency, reference planes and channel definition throughout. |
| Fixed discontinuity allocation 繚 dB | Connector, package and via contributions included only as entered. |
| Reserved margin 繚 dB | Engineering choice, not a mandated allowance. |
| Complete routing loss 繚 dB/in | Measured or validated model for the chosen copper and stackup. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.
Optional project allowance comparison
Convert the remainder into a conditional route length
The worksheet subtracts fixed losses and margin from the total budget, then divides by an entered complete routing-loss rate. In the hypothetical example, 20 dB minus 5 dB fixed loss and 3 dB margin leaves 12 dB. At 1 dB/in, that corresponds to 12 inches.
The result is conditional on the rate and boundary. It is not a maximum IT-170GT length or an approved bitrate. If a route includes different constructions, model their segments appropriately rather than assigning the best segment's rate to the entire path.

Include copper and geometry in the rate
Use a validated line model or suitable measurement for the proposed copper, dielectric and trace shape. Df accounts for dielectric behavior; complete attenuation also includes conductor effects and the actual electromagnetic field distribution.
The IT-180I review emphasizes the difference between identity evidence and electrical data. A safety document can identify a supplied material but does not furnish a reliable dB/in input. Do not estimate complete attenuation from a product-family name.
Revisit legacy routes without inventing compatibility
An existing IT-200LK drawing may need a new source or construction review. Preserve its electrical requirements and compare an IT-170GT proposal against them. Similar loss-category labels do not establish a drop-in replacement.
Check whether connectors, routing length, copper and acceptance criteria have changed since the old design. A replacement may need different trace dimensions or additional verification. Keep that work visible in both the engineering decision and commercial scope.
Request a quote around the critical channel
Send the exact material request, layer structure, copper, route lengths, frequency boundary and required testing with board dimensions and quantity. Identify which inputs are fixed and which can be adjusted. A short list of critical channels is more actionable than a broad high-speed label.
The optional cost model adds user-entered allowances only. Compare proposals on the same construction and evidence scope, and attach the local worksheet manually if useful. The final manufacturing proposal still requires review of the actual design and material supply.
Tie the exact grade to an electrical construction
State the channel reference planes, frequency range, routing length, copper construction, transitions and interface assumptions together. A laminate loss-tangent value is one input to that system. It is not a complete insertion-loss measurement or a guarantee that a data rate will work.
Use comparable measurement or modeling conditions when screening alternatives. Material changes can require geometry changes to preserve impedance, and copper roughness can alter the result independently of the resin system. Keep the proposed stackup and the channel analysis synchronized through fabrication review.
For procurement, identify the properties that are fixed and the alternatives that can be evaluated. Request evidence at the relevant construction and frequency rather than a broad low-loss label. Compare total delivered scope and validation effort alongside material price. A shorter or better-routed channel may change the tradeoff more than replacing a material name alone.
A useful design-data record retains both the material value and the reason it was selected. State whether the value is supplier characterization, a construction-specific design input, a measured coupon extraction or an early assumption. These sources are not interchangeable. Keep frequency, method and specimen information visible when a comparison uses more than one document.
The tool on this page starts empty because a plausible default can otherwise be mistaken for a verified grade profile. Use the example to understand the units, then replace it with project inputs. A result with many decimal places does not imply that the material or routing-loss input is known to that precision.
For a high-speed design, plan how the model will be checked. Reference planes, coupon geometry, fixtures and the acceptance boundary determine what a measurement means. A coupon that characterizes one line construction does not automatically qualify every route or transition on the board.
Keep the commercial comparison aligned with the engineering one. Quantity, copper, layer structure, test deliverables and qualification effort should be comparable. A lower material allowance can be irrelevant if the proposed construction cannot meet the channel requirement, while a premium grade may be unnecessary if the actual route already has sufficient validated margin.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.