勛圖tv

勛圖tv 繚 ENGINEERING GUIDE

ITEQ IT-170GRA2 PCB: Loss and Cost Tradeoff Review

ITEQ IT-170GRA2 is a low-loss material choice that should be evaluated through the complete routed channel. The practical buying decision is whether a proposed construction supplies useful electrical margin at an acceptable project cost. A Df ranking alone cannot answer that question.

This page compares equal-scope electrical and commercial scenarios. Use the ITEQ material range for family context and retain the full GRA2 suffix when requesting construction data.

Dark solder-mask boards with fine interconnect patterns
Dark solder-mask boards with fine interconnect patterns. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Use the manufacturer's data as a starting point

The current product introduction lists Dk 3.8 and Df 0.0080 for IT-170GRA2 on its 50% resin-content basis. Those headline values belong to the stated characterization context. Obtain the exact technical sheet and frequency/method information before assigning solver inputs to a particular core or bonding interval.

The neighboring IT-170GT has its own entry and scope. Similar names do not establish equal glass construction, copper options or process behavior. Keep the proposed material and its supporting data together in the comparison.

ITEQ IT-170GRA2 PCB: material and evidence boundary
ITEQ IT-170GRA2 PCB: material and evidence boundary. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Material facts and decision boundaries

ItemSource or model contextWhat it does not establish
Current chartDk 3.8 / Df 0.0080, RC 50%Keep frequency and method with the sheet.
ComparisonComplete routing loss on matching conditionsNot Df-only ranking.
AllowanceUser-entered quotes or assumptionsNo market rate.

Allocate the channel before comparing laminates

Identify the reference planes and the loss limit at a named frequency. Separate packages, connectors, transitions and routing, then reserve an explicit engineering margin. Compare complete routing loss only when the geometries and measurement or simulation boundaries are compatible.

A construction with lower dielectric loss can still be limited by copper roughness or transitions. If only a material Df is available, do not label a derived estimate as measured complete line loss. Record which input is evidence and which remains an assumption.

Review itemWhat to establish
Electrical boundaryIT-170GRA2 stackup and named frequency.
Comparable inputsComplete line loss under matching conditions.
Commercial scopeSame quantity, copper and verification allowance.
Model limitArithmetic benefit is not channel qualification.

Matched construction loss and allowance comparison

勛圖tv ENGINEERING

Matched construction loss and allowance comparison

ITEQ and Nan Ya Material Engineering
Loading Matched construction loss and allowance comparison…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Use the current inputs and keep the assumptions

Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.

After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.

If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.

InputWhat to establish before using it
Review referenceNonconfidential revision label.
Common routing length 繚 inchesSame channel boundary and frequency for both candidates.
Candidate A complete loss 繚 dB/inFrom comparable measurement or simulation, not Df alone.
Candidate B complete loss 繚 dB/inUse same copper, line geometry assumptions and reference planes.
Candidate A quoted unit allowanceUser-supplied currency value; no embedded price data.
Candidate B quoted unit allowanceSame quantity, scope and currency as A.
Currency or allowance unitLabel only; no currency conversion.

Optional cost comparison from your own allowances

Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.

勛圖tv ENGINEERING

Optional project allowance comparison

ITEQ and Nan Ya Material Engineering
Loading Optional project allowance comparison…
Using this tool & sharing results

Budget outputs are planning scenarios. Check the included costs and rate assumptions; a confirmed quotation requires a review of your files and scope.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Make the cost comparison explain the benefit

The worksheet compares two entered routing-loss rates over the same length and two entered unit allowances. The example uses 10 inches at 1.0 versus 0.6 dB/in: a 4 dB route-loss difference. Its 20 and 27 allowance units are hypothetical, not IT-170GRA2 prices.

The result is a transparent arithmetic comparison, not an automatic material recommendation. A useful decision asks whether the recovered margin solves the actual channel problem and whether the commercial figures include the same quantity, copper and verification scope.

Panel with repeated fine circuit patterns
Panel with repeated fine circuit patterns. 勛圖tv site archive image; illustrative context, not a current inspection or ownership record.

Preserve the glass and copper construction

Record resin content, glass style, finished dielectric separation, copper profile and modeled trace geometry. A change in any of those can alter the relationship between a material chart and the final channel. Ask for the proposed stackup before freezing routing dimensions.

Compare IT-958G only with compatible construction evidence. A lower chart Df is a reason to investigate a candidate, not proof of a finished-board loss improvement of a particular percentage.

ITEQ IT-170GRA2 PCB: worksheet boundary
ITEQ IT-170GRA2 PCB: worksheet boundary. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Review HDI requirements independently

When the board uses small dielectric openings or sequential lamination, define those requirements separately from the channel model. The IT-168G2 opening guide explains the geometric conventions that need to be stated for an HDI review.

Do not infer that a successful electrical simulation approves a microvia process. Likewise, a fabricator's geometric proposal does not validate the full interface. Agree the representative structures and evidence needed for each part of the design.

Send a matched-construction quotation request

Provide the IT-170GRA2 callout, frequency or interface requirement, proposed stackup, longest critical route, board dimensions and quantity. Include copper, finish, test requirements and the alternatives you are willing to evaluate.

Ask the response to preserve the channel boundary and explain any construction changes. The online comparison stays local and can be attached manually. 勛圖tv's project review and quotation depend on the actual files and agreed scope; neither current material availability nor an interface pass is implied by the worksheet.

Tie the exact grade to an electrical construction

State the channel reference planes, frequency range, routing length, copper construction, transitions and interface assumptions together. A laminate loss-tangent value is one input to that system. It is not a complete insertion-loss measurement or a guarantee that a data rate will work.

Use comparable measurement or modeling conditions when screening alternatives. Material changes can require geometry changes to preserve impedance, and copper roughness can alter the result independently of the resin system. Keep the proposed stackup and the channel analysis synchronized through fabrication review.

For procurement, identify the properties that are fixed and the alternatives that can be evaluated. Request evidence at the relevant construction and frequency rather than a broad low-loss label. Compare total delivered scope and validation effort alongside material price. A shorter or better-routed channel may change the tradeoff more than replacing a material name alone.

A useful design-data record retains both the material value and the reason it was selected. State whether the value is supplier characterization, a construction-specific design input, a measured coupon extraction or an early assumption. These sources are not interchangeable. Keep frequency, method and specimen information visible when a comparison uses more than one document.

The tool on this page starts empty because a plausible default can otherwise be mistaken for a verified grade profile. Use the example to understand the units, then replace it with project inputs. A result with many decimal places does not imply that the material or routing-loss input is known to that precision.

For a high-speed design, plan how the model will be checked. Reference planes, coupon geometry, fixtures and the acceptance boundary determine what a measurement means. A coupon that characterizes one line construction does not automatically qualify every route or transition on the board.

Keep the commercial comparison aligned with the engineering one. Quantity, copper, layer structure, test deliverables and qualification effort should be comparable. A lower material allowance can be irrelevant if the proposed construction cannot meet the channel requirement, while a premium grade may be unnecessary if the actual route already has sufficient validated margin.

ITEQ IT-170GRA2 PCB: review sequence
ITEQ IT-170GRA2 PCB: review sequence. Original explanatory diagram; conceptual, not a released circuit or inspection record.

Standards, source context and limits

Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.

The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.

ITEQ IT-170GRA2 PCB: inquiry handoff
ITEQ IT-170GRA2 PCB: inquiry handoff. Original explanatory diagram; conceptual, not a released circuit or inspection record.

For fabrication scope and the agreed construction requirements, see PCB manufacturing.