勛圖tv

勛圖tv / Order workflow

Order PCBs with a clear release record

Keep the files, engineering decisions and purchasing approval on the same revision. Prepare a useful enquiry now and preserve the evidence for a repeat order.

What does it take to order a PCB?

To order a custom bare PCB, identify the board revision, provide fabrication data and the important requirements, agree a written quotation, resolve engineering questions and authorize the agreed build. Sending files starts a review; it does not by itself approve tooling or manufacturing. An order should connect the purchased quantity to one controlled configuration and a defined delivery scope.

This guide covers the handoff from a design package to a traceable board order. If you are still choosing a board construction, start with PCB manufacturing options. If the board must arrive populated with parts, use the separate component supply responsibility guide. The manufacturing files and commercial authorization answer different questions, even when one person supplies both.

Keep three decisions separate: ���Please quote this design,��� ���I accept this engineering change,��� and ���I authorize this order.��� A useful approval record says which decision was made, for which revision, by whom and with what remaining conditions.
From enquiry to an authorized build
Sending files does not authorize manufacture. Explanatory diagram; scroll horizontally on smaller screens.

1. Send a release package that has one clear owner

Begin with a project or board part number, revision and a short file index. Include copper artwork, solder mask, legend where used, drill data and a closed board outline. State whether dimensions describe an individual board or a production panel. A ZIP containing several folders named final, final2 and new-final leaves the fabricator to guess. Remove obsolete alternatives from the release package or label them as reference-only.

Specify the layer order, material requirements, finished thickness and tolerances, copper requirements, surface finish and solder-mask requirements. List controlled impedance by layer, net or geometry as appropriate, together with the intended test/report requirements. Identify plated and nonplated holes, slots, edge features, cavities and other exceptions. A nominal layer count alone does not define a multilayer construction.

Use a fabrication drawing to make contractual requirements readable. Check it against the artwork rather than assuming a note overrides any inconsistency. If one document says 1.6 mm and another says 1.0 mm, flag the discrepancy. The supplier should not silently select the cheaper option. For a step-by-step data checklist, consult PCB file formats and release preparation.

A bare-board example from the 勛圖tv gallery
A bare-board example from the 勛圖tv gallery. The image illustrates why outline, finish and copper artwork belong to a controlled release; it does not define the specifications for your order.

2. Quote the same quantity and delivery scope

State how many individual boards you need and whether they should be supplied in arrays. Twenty panels with four boards per panel are eighty boards, not twenty boards. Identify prototype quantities and later quantity breaks separately. An annual forecast provides planning context; it is not permission to purchase that volume unless explicitly agreed.

Minimum order-basis record
ItemWhat to recordWhy it matters
ConfigurationPart number, revision and file-index referencePrevents mixing a new drawing with old copper data
QuantityIndividual boards, array count and quantity breaksAvoids panel-versus-board misunderstandings
AcceptanceApplicable documents, revision, class where relevant and exceptionsConnects inspection to agreed requirements
Commercial scopeTooling, recurring manufacture, reports, packing and logisticsMakes exclusions visible before approval
ScheduleRequested arrival date and agreed start conditionsSeparates engineering readiness from production duration

Ask for one-time charges and recurring board costs to be distinguishable. Review quote validity, currency, quantity allowance, shipping basis and the treatment of changes. A requested delivery date is not a confirmed dispatch date. The commercial offer should explain when the production schedule starts, especially if engineering answers or special material sourcing are still outstanding.

3. Resolve engineering questions before approving changes

A fabrication review may identify a conflict or a proposed process adjustment. Examples include modifying a solder-mask opening, changing an available laminate construction, clarifying a slot tolerance or agreeing panel tooling. Record each question with its disposition. ���Looks fine��� beside a screenshot is less useful than an approved reference to the affected feature and revision.

Separate a supplier's manufacturing adjustment from an electrical or mechanical design change. An artwork change near an RF trace, connector or mounting feature can affect product behavior. The design owner should evaluate that impact; a purchase-order contact is not automatically the technical approver. Ask whether updated data will be issued and whether it replaces the original package.

The Gerber ecosystem supports fabrication information beyond pictures. Ucamco describes the Gerber Job File as a machine-readable way to convey fabrication documentation. This does not mean every recipient automatically interprets every exported field. Confirm the accepted file set and keep a human-readable index of critical requirements with it.

One order, one configuration
Reconcile content, not only filenames. Explanatory diagram; scroll horizontally on smaller screens.

Build an order review record

Use this optional worksheet to list the six handoff items and their references. ���Evidence recorded��� means you entered a reference; the tool does not open the document, verify the signatory or approve the order. Unknown and open actions remain visible in the downloaded brief. You can contact 勛圖tv without completing the worksheet.

勛圖tv ENGINEERING

PCB order review record

Procurement and Handoff
Loading PCB order review record…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

The optional worksheet needs JavaScript. Use the readable checklist above or contact 勛圖tv directly.

A practical revision mix-up���and how to prevent it

Illustrative example, not a customer case: the buyer requests 80 individual boards. The Gerber ZIP is Rev C, the drill filename says Rev B and the drawing describes a four-board array. The quote is for 20 arrays. Before release, the design owner confirms that the drilling changed in Rev C, issues a complete replacement ZIP and records 20 arrays �� 4 boards = 80 individual boards. The buyer then references that package in the order.

The issue is not solved merely by renaming a drill file. The contents must correspond to the released geometry. A file index and a controlled replacement package reduce uncertainty about what was received. If the design changes after purchase authorization, stop and agree the effect on work already started, scrap, tooling, price and delivery. Do not assume an email attachment automatically replaces data on the shop floor.

For acceptance requirements, distinguish a board specification from a test result. IPC-6012 concerns qualification and performance requirements for rigid printed boards; IPC-A-600 addresses acceptability. Cite the applicable contract documents and revisions with the supplier. Neither a standards reference on a website nor a completed checklist proves that a particular batch meets your purchase requirements.

4. Make repeat orders explicit

A repeat order is easier when the accepted configuration has a stable reference. State the prior order reference, board revision, new quantity and any changed requirements. Review material availability, finish, delivery form, inspection records and packing rather than assuming that every term remains unchanged. The same board filename may have been overwritten since the earlier build.

Record whether ���no design change��� also means no change to the required test documentation, markings or destination. A revision can remain electrically identical while procurement requires a different label or traceability level. Those requirements still need to appear in the new offer and release record.

If an earlier prototype contained authorized deviations, decide whether they remain acceptable for the repeat run. A successful prototype does not automatically approve permanent deviations. For the broader decision about freezing a design and moving to repeat manufacturing, use the prototype-to-production release guide.

Existing 勛圖tv packaging image
Existing 勛圖tv packaging image. The useful order question is which revision, quantity and traceability information must accompany each shipment���not whether a carton looks similar to this example.

5. Close the loop at receiving

Agree the expected shipping labels and documents before dispatch. On receipt, compare part number, revision, quantity and supplied records with the order. Record visible transit damage or broken protective packaging before mixing the boards into stock. Keep suspect material identifiable while the responsible teams investigate.

Do not use packaging appearance as proof of all electrical or dimensional requirements. Receiving inspection should follow your agreed acceptance plan. If the order includes a test report, confirm it applies to the shipped lot and specified features. Ask for clarification when a report uses a different part number, sampling basis or measurement unit.

Receive against the agreed identity
Keep discrepancies separate from accepted stock. Explanatory diagram; scroll horizontally on smaller screens.

Retain the approved files, written dispositions, offer, order reference and receiving result together. This creates a useful baseline for the next purchase and for any corrective action. It also lets a new buyer understand the history without reconstructing the order from scattered email threads.

Before placing the order

Can I enquire before the design is complete?

Yes. State what is provisional and what decision you need help making. A concept discussion or budget can proceed with incomplete data, while a manufacturing release needs an agreed configuration. The quote preparation page explains the available routes.

Does a Gerber preview approve the electrical design?

No. It helps inspect exported artwork. Netlist checking, design verification and fabrication acceptance are different activities. Agree what is included and who owns each decision.

Can I change quantities after approving a quote?

Discuss the change before assuming the original unit cost or delivery applies. Panel utilization, setup allocation and material commitments can change the revised offer. Keep the updated scope with the order.

Does this worksheet place an order?

No. It prepares a local text record. Download and review it, then attach or paste the relevant information into your enquiry. Only the agreed commercial and engineering process can authorize production.

Bring the open questions to 勛圖tv

Send the project reference, available files, quantity options and the decisions you need help with. If you used the worksheet, review its assumptions and attach the downloaded brief yourself. Opening Contact does not send the worksheet or place an order.

Technical references and scope

These official references explain data, standards or handling concepts. Use the applicable controlled documents and project agreement for acceptance. Links do not certify 勛圖tv, qualify a product or replace engineering approval.