勛圖tv 繚 ENGINEERING GUIDE
ITEQ IT-988GSE PCB: Low-Dk Glass and Channel Review
ITEQ IT-988GSE is identified in dated manufacturer high-speed material presentations. It should be kept separate from similarly named current products such as IT-988GLSE. For an engineer reviving or quoting a design, that one-letter distinction can determine which electrical construction data applies.
This page focuses on the exact historical suffix and a complete channel budget. The ITEQ material hub covers family selection; it does not make neighboring product names interchangeable.

Distinguish GSE from GLSE before copying data
The 2023 manufacturer presentation places IT-988GSE in a low-Dk-glass, ultra-low-loss group. Current product introductions include IT-988GLSE with a different spelling. This review does not establish an automatic identity or replacement mapping between those entries.
Keep the original IT-988GSE sheet, copper construction and approval record where available. Request a written explanation if a supplier proposes GLSE or another variant. A newer catalog value should not be presented as an exact GSE specification without evidence.
Material facts and decision boundaries
| Item | Source or model context | What it does not establish |
|---|---|---|
| Dated identity | IT-988GSE in 2023 guide | Low-Dk-glass context. |
| Current neighbor | IT-988GLSE | No equivalence mapping assumed. |
| Application labels | Platform examples | Not arbitrary channel qualification. |
Treat application examples as context
A manufacturer presentation can associate materials with platforms or interface generations without qualifying every possible board layout. Such examples do not establish a maximum bitrate for an arbitrary trace, connector and via construction.
Start with the actual channel requirement and reference planes. The IT-958G guide explains why dielectric-only attenuation is not total routing loss. For GSE, the proposed reinforcement and copper need to remain in the complete electrical model.
| Review item | What to establish |
|---|---|
| Suffix control | IT-988GSE is not assumed to be IT-988GLSE. |
| Source context | Dated platform examples are not channel approval. |
| Complete model | Glass, copper, geometry and reference planes. |
| Tool limit | Entered loss budget does not qualify bitrate. |
Allocate loss without hiding fixed contributions
Record the channel limit at a named frequency, fixed discontinuity losses and an explicit margin. Use a measured or validated complete routing-loss rate for the actual construction. Do not substitute a Df value for a dB/in rate.
The tool's example is a generic 20 dB budget with 5 dB fixed losses, 3 dB margin and a 10-inch route at 1 dB/in. Its remaining 2 dB is an arithmetic result only. No IT-988GSE performance or interface approval is implied.

Review glass and routing interactions
Preserve glass style, resin content and routing geometry when comparing available constructions. A low-Dk-glass family label does not resolve the dielectric thickness or copper profile on every layer. Timing and loss models should follow the proposed stackup rather than a generic material selection menu.
For an older phase-sensitive design using IT-200LK, identify both delay and loss requirements before considering a change. Keeping nominal impedance alone may not preserve all circuit behavior.
Channel loss budget at one frequency
Channel loss budget at one frequency
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Allowed channel loss 繚 dB | Your interface budget at a named frequency and reference planes. |
| Allocated connectors and transitions 繚 dB | Verified or assumed allocation at the same frequency. |
| Reserved engineering margin 繚 dB | Project allocation, not a standard default. |
| Measured or modeled routing loss 繚 dB/in | Complete trace loss for the actual construction, including copper. |
| Routed length 繚 inches | Sum along the agreed uniform routing model. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a 勛圖tv quotation. You can contact the team without completing it.
Optional project allowance comparison
Compare a material premium against a defined benefit
The useful commercial question is what the proposed construction changes in the channel and which verification work is included. The IT-170GRA2 comparison offers a separate matched-cost and loss worksheet for that decision structure.
Do not invent a price multiplier for low-Dk glass or assume a historical product remains available at a quoted lead time. Request current construction availability, quantity breaks and any qualification cost. Compare the same deliverables and acceptance scope.
Send the source discrepancy with the RFQ
Provide the exact IT-988GSE drawing, source revision, stackup, copper, critical channels, dimensions and quantity. Include the GSE-versus-GLSE question explicitly if it is unresolved. State which substitutions require approval.
A useful reply identifies the supplied product and construction, supporting electrical data, test scope and exceptions. The local worksheet can support that exchange but is optional. Final suitability, price and availability are confirmed against the actual project, not a platform label in a dated brochure.
Tie the exact grade to an electrical construction
State the channel reference planes, frequency range, routing length, copper construction, transitions and interface assumptions together. A laminate loss-tangent value is one input to that system. It is not a complete insertion-loss measurement or a guarantee that a data rate will work.
Use comparable measurement or modeling conditions when screening alternatives. Material changes can require geometry changes to preserve impedance, and copper roughness can alter the result independently of the resin system. Keep the proposed stackup and the channel analysis synchronized through fabrication review.
For procurement, identify the properties that are fixed and the alternatives that can be evaluated. Request evidence at the relevant construction and frequency rather than a broad low-loss label. Compare total delivered scope and validation effort alongside material price. A shorter or better-routed channel may change the tradeoff more than replacing a material name alone.
A useful design-data record retains both the material value and the reason it was selected. State whether the value is supplier characterization, a construction-specific design input, a measured coupon extraction or an early assumption. These sources are not interchangeable. Keep frequency, method and specimen information visible when a comparison uses more than one document.
The tool on this page starts empty because a plausible default can otherwise be mistaken for a verified grade profile. Use the example to understand the units, then replace it with project inputs. A result with many decimal places does not imply that the material or routing-loss input is known to that precision.
For a high-speed design, plan how the model will be checked. Reference planes, coupon geometry, fixtures and the acceptance boundary determine what a measurement means. A coupon that characterizes one line construction does not automatically qualify every route or transition on the board.
Keep the commercial comparison aligned with the engineering one. Quantity, copper, layer structure, test deliverables and qualification effort should be comparable. A lower material allowance can be irrelevant if the proposed construction cannot meet the channel requirement, while a premium grade may be unnecessary if the actual route already has sufficient validated margin.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not 勛圖tv production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.